CF TownC P/C-CS 970207COPPELL ENGINEERING
UTHJITIES DIVISION
MI~MORANDUM
DATE:
TO:
FROM:
RE:
February 7, 1997
Larry Slnlth
Walk thru for Coooell Criminal courts Buildine
A walk-thru on the above referenced project was conducted on February 7, 1997 and the
items below were found to be deficient.
1. Need to oum_n out both vaults So I can check to see if vault walls have link seals in
2. Need to remir Fire Truck Hook-UP ~hakln.~ and very_ loose (_oossible leakin~,~.
3. [ still need to check to see if orouer fitting is installed on check valve
Please ensure that these items get taken care of and if you have any questions, please give
mea call
HLP/akl
'-' COPPELL ENGINEERING
UTILITIF. S DIVISION
MEMORANDUM
w~ th~u for ~,~//
A walk-thru on the above referenced project wa~ conducted on
and the items below were found to be deficient.
10.
Plea.se e~sum that these items get taken care of and if you have any questions, plea.se
,give me · can.
H/.Wdg