CF TownC P/C-CS 970207COPPELL ENGINEERING UTHJITIES DIVISION MI~MORANDUM DATE: TO: FROM: RE: February 7, 1997 Larry Slnlth Walk thru for Coooell Criminal courts Buildine A walk-thru on the above referenced project was conducted on February 7, 1997 and the items below were found to be deficient. 1. Need to oum_n out both vaults So I can check to see if vault walls have link seals in 2. Need to remir Fire Truck Hook-UP ~hakln.~ and very_ loose (_oossible leakin~,~. 3. [ still need to check to see if orouer fitting is installed on check valve Please ensure that these items get taken care of and if you have any questions, please give mea call HLP/akl '-' COPPELL ENGINEERING UTILITIF. S DIVISION MEMORANDUM w~ th~u for ~,~// A walk-thru on the above referenced project wa~ conducted on and the items below were found to be deficient. 10. Plea.se e~sum that these items get taken care of and if you have any questions, plea.se ,give me · can. H/.Wdg