Loading...
CF-Cozby Library-CS 950412COPPELL ENGINEERING DATE: TO: FROM: RE: ~ ~Oi~ig~onstruction Inspector Howard Pafford, Utilities S~ ~o.ow u~ Wa~ ~rou~ ~or A follow up walk-thru was conducted and these following items remain deficient. Edge of vault covered by burm. vault and both cans. Burm needs to be moved off the dg