CF-Cozby Library-CS 931110DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMORANDUM
November 10, 1993
Engineering Depart~l~t
Public Works Staff~
Development Fees for City of Coppell
Library
The following fees
referenced project.
Water Impact Fee:
1 - 2"
1 - 6"
Total 10.5
100% due prior to Council approval
should be assessed and collected on the above
Domestic/Irrigation Meter/s = __
Fireline Meter/s = 2.5 ESU's
ESU's @ $650.00 ea = $6,825.00
of the final plat.
8 ESU's
Wastewater Impact (City)
1 - 2" Domestic Meter/s =
Total 8 ESU's @ $450.00 ea =
100% due prior to Council approval
8 ESU's
$ 3,600.00
of final plat.
Water Tap Inspection Fee
2 Connections @ $100.00 each = $ 200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Utility Final Inspection Fee (Ail D~V~opment)
1 lots @ $50.00/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee
1 - 2"
1 - 6"
(Domestic)
Domestic Meters
Fireline Meters
288.10 ea = $ 288.10
$1,338.90 ea = $1,338.90
Total $1,627.00
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Deposit (Residential)
Meters @ $30.00 ea = $
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters @ $35.00 ea
100% due prior to issuance
Irrigation Meter Deposit
__ Meters @ $35.00 ea
100% due prior
= $
of water meters.
= $
to issuance of water meters.
FEES.LIBRARY