Loading...
CF-Cozby Library-CS 931110DATE: TO: FROM: RE: COPPELL PUBLIC WORKS MEMORANDUM November 10, 1993 Engineering Depart~l~t Public Works Staff~ Development Fees for City of Coppell Library The following fees referenced project. Water Impact Fee: 1 - 2" 1 - 6" Total 10.5 100% due prior to Council approval should be assessed and collected on the above Domestic/Irrigation Meter/s = __ Fireline Meter/s = 2.5 ESU's ESU's @ $650.00 ea = $6,825.00 of the final plat. 8 ESU's Wastewater Impact (City) 1 - 2" Domestic Meter/s = Total 8 ESU's @ $450.00 ea = 100% due prior to Council approval 8 ESU's $ 3,600.00 of final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail D~V~opment) 1 lots @ $50.00/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee 1 - 2" 1 - 6" (Domestic) Domestic Meters Fireline Meters 288.10 ea = $ 288.10 $1,338.90 ea = $1,338.90 Total $1,627.00 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Deposit (Residential) Meters @ $30.00 ea = $ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) Meters @ $35.00 ea 100% due prior to issuance Irrigation Meter Deposit __ Meters @ $35.00 ea 100% due prior = $ of water meters. = $ to issuance of water meters. FEES.LIBRARY