CF-Coppell Rd SC-CS021009To:
From:
Date:
RE:
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
Larry Davis, Construction Inspector Engineering
Larry Morton, Public Works Streets Division
October 9, 2002
Walk-thru Coppell Service Ceqter
1. Rout and seal random cracks in driveway going into service center.
2. Clean up concrete spilled on driveway going into service center.
3. Remove forms on drive approach on Copper Road.
4. Take zip strips out of curb joints and seal.
5. Stain all ADA ramps brick red. (STAIN not Paint)
6. Water ponding at ADA ramp north side of building northwest corner.
7. Rout and seal all random cracks in parking lot inside secure area.
8. Large water ponding area west side of pole barn.
9. Water ponding where concrete meets asphalt in southwest corner.
10. Tear out and replace sidewalk on southwest side of entrance to main building.
11. Rout and seal aH random crack in concrete parking lot.
12. Water pondlng in middle of asphalt parking lot on south side of driveway.
13. Large water ponding at radius of asphalt parking and curb line by light pole on north
side of driveway.
14. Backfill and clean behind curbs and entire area.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
10/09/02 10:21
ID=CITY OF COPPELL
DATE
10/09
S,R-TIME
00'5?"
DISTANT STATION ID MODE PAGES RESULT
9?2 304 9041 CALLING 03 OK 0000