Loading...
ST9302-CS 991018FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 October 18, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: It is our understanding that the Homeowner's Association for the subdivision near Trailwood Lane has stated that they do not intend to relocate their irrigation system devices that are located in the median on Trailwood Lane and in the proposed sidewalk locations on either side of Sandy Lake and Trailwood. The devices in question are in conflict with the proposed improvements and will need to be relocated prior to completion of the paving and sidewalk work at those locations. The location of the devices will not allow EBCC to cap the lines at the ROW without rendering their complete system inoperative. An additional issue at this location is that of the existing median on Trailwood Lane and the final disposition of that median. The plans indicate that the proposed paving on Trailwood is without a median island; however, the existing median on the remaining portion of Trailwood will have to end abruptly at the Sandy Lake ROW line, be extended into the new portion of the paving, or be modified beyond the Sandy Lake ROW line. Please advise our office regarding both of these issues. If you have any questions regarding these issues, don't hesitate to contact our office. Sincerely, e 1 C nstru n Company Robe . Weber Project Engineer XC: Michael G. DeMotte, Kimley-Horn and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER