CF-Fire Station 2-CS 971001COPPELL ENGINEERING
UTILITIES DIVISION
MEMORANDUM
DATE:
TO:
FROM:
RE:
October 1, 1997
Larry Davis, Construction Inspector
Larry Smith, Utilities Crewleader
Walk thru for Fire Station//2 on MggArthur
A follow-up walk-thru on the above referenced project was conducted on 10/1/97
and all punch list items have been corrected.
1. Sewer Clean out and line is stopped up unclog (in front of North side)
2. Sewer clean out & line stopped up unclog (in front on South side)
If you have any questions, please advise.
LS/ald
COPI~.LL ]~GIN~-~'~I~G
~-~
o.
RE: Walk thru for ~ ~ o
A walk-thru on the above referenced project was conduc'~l on
and ',.he ~te.,,s oe. ow were found to be defident.
,.,,p.
Please ensure that these items get ~ cam of and if you I~ve any questions,
gtve me a call.