CF-Fire Station 2-CS 970926COPPELL STREETS DIVISION
DATE:
TO:
FROM:
RE:
September 26, 1997
Larry Davis, Construction Inspector
Per Birdsall, Streets Division
Follow up Walk Thru Fire Station #2
Listed below are Street Division comments relative to walk thru.
1. The punchlist items appear to have been completed. However,
an additional note noticed at this time is that the pavers
2. used are a different size which has created an unacceptable
space(qap) in the paver band on MacArthur [North band~. This
brinqs up the question whether 6cm or Scm pavers were used.
If 6cm were used, they should all be replaced: and if Scm
were used the space (qap) should be filled with an additional
slice of paver to prevent inevitable failure of the band.
Se
MESSAGE
CONF I RMAT I ON
09×26×9? 10:26
ID=CITY OF COPPELL
DATE
09×26
S,R-TIME DISTANT STATION ID MODE PAGES
00'35" CITY OF COPPELL CALLING 02
RESULT
OK 0000