ST9302-CS 991014FAX (214) 352-3201 · ~'~ ~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY ~ ....~' POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 October 14, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: It is our intent to begin paving phase 1 of the referenced project on October 19, 1999. Phase 1 will consist of paving a 27' section of the west bound lanes from STA 56+00 to STA 4+84. We will begin our paving operation at Moore Road and progress toward Denton Tap Road. As discussed previously, we intend to keep the concrete mixer trucks in the roadway and discharge the concrete into our concrete placer which will be positioned in the grade in front of the slip form paving machine. Our placer is a tracked machine with rubber track pads that will not damage the grade or the steel. Keeping the placer in the grade rather than the roadway will allow for smoother traffic flow around the paving operation. To control traffic around the paving operation, we intend to utilize flag men and traffic cones. As directed, we have positioned message boards on either end of the project to inform the traveling public of the expected traffic delays. Enclosed for your review are plan sheets for the proposed paving. The cross hatched areas will not be paved during the main lane paving operation, but will be paved while maintaining traffic at these intersections ar~.d drixTeways. With regard to your questions about the traffic patterns for the concrete mixer trucks. Our loaded trucks will travel along Sandy Lake Road from east to west and stop at the concrete placer to discharge their load. After discharging their load, the mixer trucks will travel to our office site, wash out, and return to the plant along Sandy Lake Road. If the paving operation has passed the office site, the mixer trucks will follow the following traffic pattern: 1. Continue to Denton Tap Road and turn left. 2. Turn left on Bethel School Road. AN EQUAL OPPORTUNITY EMPLOYER Page 2 Sandy Lake Road Reconstruction Re: Paving plan for Phase 1 3. Turn left on Heartz Road. 4. Turn right on Sandy Lake Road and proceed to the wash out area. 5. After washing out the trucks, they will return to the plant site along Sandy Lake Road. If you have any questions regarding this information, don't hesitate to contact our office. l~ncerely, Robert D. Weber Project Engineer XC: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 ~~' ~~~ ~ ~ .... - ~ . .----: . , -- ~- . . . ~'~ ~ ~ ~ ~_~ . ~ ~ , ', ', - ~ ,t ,, / , ~ / /~ , L J ..-- __ II ~~.-- h /--'~J ~ ~~~---~~ ..... ~~- -. ~ .... _.. ~ _ ~. ~,i ~ , ~ ~ =~, .b~-~~--- ~,~ . -~-~.~ - mm om CITY OF COPPELL, TEXAS ~~,1~. SANDY L~E ROAD IMPRO~MENTS .= , ' _~ -- ~._.. ..... .~ , ~__ ~~, .~~ .... ~ ~~~~,.~~_ _=~_,~ .... ~~ ~ __ ~l,L ~ . L~ ~ ~~ ...... .. ._ ~,~, ~ ~~~,~ :- ~ .... _.. ,: ~ . ' i ~ ~ . . ~..- _ _ . ~m om CITY OF COPPELL, ~XAS m~~ ~ ~ ~ SANDY L~E ROAD IMPRO~MENTS