Loading...
Coppell Bible-CS030521 T H E ¢ I T Y . O F COPPE L P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3681 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO VER SHEET To: Tony Scorsone - EMJ Corporation From: Teresa Turner Fax: 972-580-8202 Date: 5/21/2003 Phone: 972-242-1210 Pages: Re: Coppell Bible Fellowship CC: [] Urgent r-lFor Review [] Please Comment [] Please Reply [] As Requested Tony: I have attached the revised and original inspection fee breakdowns for the project. It has been deterrmned that inspection fees for the public portions of the water and sanitary sewer installations were calculated at 2% rather than the 4% required for public work. The remaining 2% of the inspection fees for the completed work is $362.38. This amount should be paid in the engineering department. If you have any questions, please contact me at 972-304-3681. CC: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Adminislxative Secretary, Building Inspections Glenn Hollgw~ell~t4II~p~e~c~[.9.f.~.P. ublic Works ~eg*~es, C' C' C~ef B~fldmg Officml Brad Reid, Director of Parks and Recreation Garreth Campbell, Construction Inspector Ken Griffin, Director of Public Works/Engineering IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Coppell Engineering- Excellence By Design" Coppell Bible Fellowship City Inspection Fee Breakdown October 23, 2002 Public Work Private Work Item Quantity Unit Subtotal Inspection Quantity Unit Subtotal Inspection Price Fee 4% Price Fee 2% Concrete Paving 6" 4,000j~s~i .... ' .... ~,611 S~F $2.1..5 $3,46~.65 $1~.5~ ~7142 S~' $~.~} $64,805.30 $1,296.11 5" 4,000 psi 3,0,259 SF $195 $59,005.05 $1,180.1( Concrete Paving Total ......... $3,463.65 $138.55 /' ___ $_1_2.3,810.35 $2,47621 Water 10" DR 18 ~> L,~ 1~:I,~ ~,.~- r2')~-~fi~(,o 1130 LF $19.25 $21,752.50 $4350.~ 10" DBL. Detector Check/Vault __.'1~ _ ~r:le:~-~ ~"]~>,,~O __ EA $9~,45~0 $9,450.00 $189.0( 10" Gate Valve 4 EA $1,025 $4,100.00 $82,0( 10"x 10" Tapping Sleeve & Va!ve~ __[ __ _~_ ~2~1~.__ a~_._l_~ [~.¢0_ ..... E~A~ $2~,71_5 $2,71500 $54.3( 8" Gate Valve 2 EA $645 $1,290.00 $25.8( 6" Gate Valve __5 _E~A. $~5.2~ __ $~2,625.00 $52.50: 8" DR 14 20 LF $17 $340.00 $6,80 6" DR 14 15 LF $16 $240.00 $4.8( 6" DR 14 Fire Hydrant Lead 15 LF $16 $240.00 $4.80 6" Fire Line 55 LF $16 $880.00 $17.60~ I 1/2" Domestic Service · ~. ~ ~2..t90 . EA $2~260 $2,200.00 $44.00[ I l /2" Domestic Water Line ........... . ~., .......... 5_80 LF __$14 ~$8,1~2_~0~0 Concrete Encasement l0 LF $20 $20000 $4.0( Fire Hydrant ...................... 3 EA $1,300 $3,900,00 $780( Fittings ~::~ ~ 16 EA $325 $5,200.00 $104.0( Water Total .............. $65,052.50 $1,301.05 San_ita~g Sewer 6"SDR35 325 LF $17_ $_5_,525.00 $110.5( Connect lo Manhole ~ ~ ~_ (g::3~ j~S:~.~ EA $645 $645.00 S129( Concrete Enclosure 10 LF $25 $250.00 $5.0( Cleanout EA $150 $150.00 $30( Sanitary Sewer Total ~1~.~3~) $6,570.00 _____$131.40! Storm Sewer 27" RCP 20 LF $45 $900 $36.013 24,~RC~ ...................... 71 L--~---- $38 ___$2~,~_9_8_~_~107._ 92 .___46 L__F $38 $1,748.0_0 ~$_34.__96 __24'~'T~"C" Headwall EA $1,300 $1,300 $52.0~ 10' Curb Inlet 1 EA $2,125 $2,12500 $42.501 Rip Rap ..... ~--9 ~S~-' -'~-5 $49500 $9.90 Storm Sewer Total $4,898 $195.92 [ $4,36800 $87.36' Grading ................ ._ __~4,5_4_9 _Cy $3.81 $17,331.69 $346.63 Erosion Control 1 LS $5,622 $5,62200 $112.4,~ $8,362 $33447 $222,754.54 $4,455.0[ COFFELL INSPECTION FEE CALCULATION SHEET PROJECT NAME ~-o,°?v~c- ~,CSL~ ~'C't. cO~Z,~e DATE As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: PUBLIC IMPROVEMENTS X 40/0 = PRIVATE IMPROVEMENTS X 2% = CONTRACT AMOUNT CONTRACT AMOUNT PAVING WATER ©5Z, o 7¥o I SANITARY SEWER ALLEYS SIDEWALKS OTHER ~_~Ve_,x'D~c? ~ I"l, '3~i , (,,q ~/ "34b, 6,3