Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Coppell Bible-CS020920
DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIG NAT ON DATE: Coppell Bible Fellowship NDM 9/20/2002 SENT ASSESSMENT ASSESSED FEE AMOUNT PAll DATE Water impact Fee $4,340.00 $4,340.00 tmt Wastewater Impact Fee $1,400.00 $1,400.00 tmt Park Fee Roadway Impact-Zone revised roadway impact Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection WaterTap Inspection $150.00 $150.00 tmt Wastewater Tap Inspection $50.00 $50.00 tmt Water Meter (Domestic) $142.10 $142.10 tmt Water Meter (Fire/Irrig) $3,215.95 $3,215.95 tmt Meter Deposit (Domestic) $30.00 $30.00 tmt Meter Deposit (Fire/Irrig) $60.00 $60.00 tmt Utility Final inspection $50.00 $50.00 tmt 9/20/2002 9/20/2002 10/25/2002 10~30/2002 9/20/2002 9/20/2002 9/20/2002 9/20/2002 9/20/2002 9/20/2002 9/20/2002 10/30/2002 10/30/2002 $728.52 $728.52 trot 10/30/2002 $4,789.56 $4,789.56 tmt 10/30/2002 10/30/2002 10/30/2002 10/30/2002 10/30/2002 10/30/2002 10/30/2002 10/30/2002 mSubtotal to Eng. $5,518.08 $5,518.08 $0.00 Total Fees Fees Paid Amount Owed TOTALS $14,956.13 $14,956.13 $0.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.