Loading...
Coppell Comm 1R3-CS020418DEVELOPMENT FEES PROJECT NAME: Coppell Commerce Center (Royal Park) ENGINEER: Jones & Carter OR G NAT ON DATE: 2/18/2004 SENT ASSESSMENT ASSESSED FEE AMOUNT PAlE 2/18/2004 Water Impact Fee $5,180.00 $5,180.00 Wastewater Impact Fee $2,240.00 $2,240.00 Park Fee n/a Roadway Impact-Zone $8,425.01 Street Sign Street Light 4/19/2004 Construction Inspection $8,550.00 $8,550.00 rb 4/14/2004 EG or Bore Permit $2,100.00 $2,100.00 rb Overtime inspection Water Tap Inspection $200.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $188.48 Water Meter (Fire/Irrig) $4,157.48 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $90.00 Utility Final inspection $50.00 $8,425.01 rb 3~0 mc ,969.00 mc mc mc DATE 4/27/2004 4/27/2004 4~8~2004 4/19/2OO4 4/14/2004 5/13/2004 5/13/2004 2/3/1915 ~Subtotal to Eng. $19,075.01 $19,075.01 $0.00 Total Fees Fees Paid Amount Owed TOTALS $31,260.97 $30,624.01 $636.96 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.