Coppell BC3 Con-CS001020 214 304 35?0
10/~/00 13:04 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0,793 ~01
October 20, 2000
Kyle Braw. lett
Lincoin Property Co.
3300 Lincoln Plaza
50ON. Akard
Dallas, Texas 75201-3394
RE: Coppell Business Center i11, Lot~ 1 & 2, Block C
Finnl Accep~lce
Dear Mr. Bramlctt:
A final inspection of paving and utilities for the referenced project has been confu'med by
representatives of the City of Coppell.
Thc two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the dam of this letter. Maturily on the Erosion
Control Bond will also be two years from the date of this letter.
Lanny Allison
Construction ll~'pector
Mike Martin, Assistant City Engineer
Debi lngram, Engineering Secretary
Gle~n Holloweii, Director of Public Worl~
Greg/ones, Chief Building Official
Travis Crump, Fire Manhal
James Cofer. TriDal (fax: 817481-8195)
c~ris Butler, Butler Const. (fax: 81%267-1902)