Loading...
Coppell BC3 Con-CS001020 214 304 35?0 10/~/00 13:04 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0,793 ~01 October 20, 2000 Kyle Braw. lett Lincoin Property Co. 3300 Lincoln Plaza 50ON. Akard Dallas, Texas 75201-3394 RE: Coppell Business Center i11, Lot~ 1 & 2, Block C Finnl Accep~lce Dear Mr. Bramlctt: A final inspection of paving and utilities for the referenced project has been confu'med by representatives of the City of Coppell. Thc two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the dam of this letter. Maturily on the Erosion Control Bond will also be two years from the date of this letter. Lanny Allison Construction ll~'pector Mike Martin, Assistant City Engineer Debi lngram, Engineering Secretary Gle~n Holloweii, Director of Public Worl~ Greg/ones, Chief Building Official Travis Crump, Fire Manhal James Cofer. TriDal (fax: 817481-8195) c~ris Butler, Butler Const. (fax: 81%267-1902)