Loading...
Connell Skaggs-CS 900530COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: May 30, 1990 Steve Gora~, Director of Public Works Larry ~,/Construction'~'l Inspector Connell/Skaggs - Coppell High School Tickler 5/30/90 I am responding to your request memo dated May 25, I990, t.3 determine whether there is any official record or agreement ~$ !~ city commitment regarding Willow Lane south to Sandy Lake Roac. No official record was located in the records researched by ~e. however, I am attaching a copy of a letter sent to Mr. ~rank Tlaudo Deputy City Manager dated January 22, 1987, addressin~ drive modification on the preliminary plat related to school traffic Glow on Willow Lane. If I can be of further assistance, please let me know. Thank you. CLD/bb xc: Shohre Daneshmand, Acting City Engineer Ben dela Cruz, Engineering Technician John Karlsruher, Ginn Inc. COPPELL INDEPENDENT SCHOOL DIST YICT ,~ ~, David P. Sta~field January 22, 1987 Hr. Frank Trando Acting City Hanager City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Coppe11 High School Dear Hr. Trando: This letter is to serve as confirmation to you and the Council :hat the C,~ppcl) Independent School District fully intends to address the conc~rns ¢×pl~s-,t by the Council at their last meeting regarding our new High School siLe. tleeti~9s between the School District and Univest have been held and U~ivest has e~::'essed their willingness to provide the District with an easement to allow ~ t~*.te~:,Jc~ of Parkway Blvd. and an access road to the school site, prior to the comple~on of the new High School building. Please accept this letter as the School District's commitment to ~o th~ following in answer to the Council's concerns: Construct the required portion of Parkway Blvd. to provide access to the school site prior to the opening of school in the Fall of 1987, on an easement provided by Univest. The District will convey the storm waLer alot)g the schooils east boundary line from the south end of our property to the north end, in a buried ~ulvert system. This culvert will be constructed on School District property and will have the necessary out-fall treatment at the north property llne to prevent erosion. The school driveway configurations have been modified on the revised preliminary plat to prevent intermingling of school traffic with Willow Lane or other residential streets to the south of the property. Only a fire access pavement section has been provided from the school service drive to-Willow Lane, in accordance with the requirements of the Fire Chief. This driveway w111 have a permanent locked gate with the only key being issued to the Fire Department. Attached please find a letter from Chief Hayfield indicating his acceptance of this procedure. As you can see from the preliminary plat, all school traffic will enter and exit from Parkway Blvd. Construction access will be provided from the 24 ft. easement, from Denton Tap to the school's property line. 1~01 Wrangler Drive Coppell, Texas 75019 (£1~) ~71-1111 o I.n addition to the easements for Parkway Blvd. and the school site access road, Unlvest and C.I.S.D. have agreed on the concept for the granting of additional easements. These include easements for the out-fall of the box culvert along the east property line and a buried storm drainage pipe at midpoint of the north property line that continues to Cottonwood Creek. School District has employed the services of Barton & Ashman, traffic consultant, to prepare a traffic study in accordance with the City's consultlng engineer's require- ments. This study is now underway and will be available shortly. A copy of this agreement is also attached. I trust this letter will serve to show the School District's willingness to work with the City of Coppell. We look forward to the successful completion of this project, which will provide a facility that the entire community can be proud of. Very truly yours, David P. Stanfield Superintendent of Schools Barton-Aschman Associates, Inc. 5485 Belt Line Road, Suite 199, Dallas, Texas 75240 Jar~/ary 21, 1987 Coppell Independent School District %Mr. Gary Keep SHWC Archit_ _~cts 5601 MacArthur Boulevard Irving, Texas 75038 Mr. Keep: Barton-Aschman Associa+m-~, Inc. is pleased to respond to the request by Mr. Tom Rutledge of Teague, Nall and Perkins to provide this proposal for professional transportation engineering services in connection with the proposed high school in Coppell, Texas. In order that we address the concerns of the City of Coppell, we have prepared a Scope of Services for this project. If a_~__~, this letter will become an agreement between the Coppell Independent School District and Barton-Aschman Associa~-~, ~ to provide services outlined in tbm Scope of Services Our p~oed Scope of Services will include the iollowing work tasks. Site Traffic Characteristics - P~a~ upon the projec*~ enrollment of the high school, the existing area demographics, anfi the ~rea roadway system, we will aoo~lish the following: Site Traffic Generation - Est/mat~s of the 'traffic generated by the site will be prepared for the morning and afternoon peak hours of school traffic. Site Aocess - We will evaluate access to the school from Parkway Boulevard to determine the size (number of lanes) that will be required to accommodate the expected traffic generated by the school. Documentation - We will provide a memorandum report that documents the s~y procedures and fir~ngs/oo~clusioDs of the study. Ten (10) copies of the report will be fur~ to yo~ Barton-Aschman Associates, Inc. Ooppell Independent School District Jar~wy 21, 1987 Page 2 Our fee for completing the Scope of Services outlined above wi2.1 be based on our hourly rates, current at the time of performance, for staff services rendered. Based on o~r experience in studies of this type, we estimate that the fee for completion of Tasks 1 through 3 will be We will not exceed th/s fee without receiving your prior authorizatiorn If the need for extra services should arise, we will seek your authorization and, before proceeding and if requested, we will supply you with o~r best estimate of the fee to be Direct reimbursement for out-of-pocket expenses such as travel, reproduction, etc., will be billed at 110 ~ (110%) of oost and wi!~ be added to staff time costs incurred on the projec~ Invoices w~ ] ] be submitted to y~a monthly and beoome due wit2~%n (3O) days of the data of ~nVoice. Barton-Aschman Associates, Inc. Ooloi~-ll Indeper~_ent School District Jantlary 21, 1987 Page 3 We are prepared to commence work on this project immediately following receipt of a signed copy of this Letter of Agz~m~_nt. We sincerely appreciate the opportunity to provide this prcsx~=al a~ 10ok forward to working with you on this project. If you bare any questions regarding the pzu~oosal, please do not hesitate to call. Sincerely, Gary D. Jost Associate Jack }latchell, P.E. Vice President / GD3/J V m (Signature) (Pril~ted or Typed Nam~ r /k, (Title) Jackie R. Mayfield Fire Chief P.O. BO), Coppell, TExas 214-,16 ~-! 133 January 22, Ig87 Dr. David Stanfield, Superintendent Coppell Independent School District 1201 Wrangler Drive Coppell, Texas 75019 Dr. Stanfleld The purpose of this letter is to clarify the Fire Department's position in the use ol Willow Lane as an emergency entrance to the campus of the new Coppell High School. This department has no objection to the School District providing a secondary ingress/egress to the campus from Willow Lane. A gate, secured by lock, chain, and key. with the key(s) provided to this agency is acceptable. A "road", as you suggest, must meat the standards of construction as detailed in the City of Coppell's ordinances. Please understand that the question/position this is addressed here pertains only the emergency ingress/epress to the property. Do not construe this as to ~n endorsement for domestic vehicle usage of Oak Trail or Shadydale. Thank you for your concern for fire and life safety rot this facility. Sincerely, z ..... .-,. · /"Je~kie R. I~layfield~.~./~,''--" //' F~/~e Chief -_>-' cc: Frank Trando - Interim City Manop~r Taryon Bowman - DRC Chairperson