Loading...
Connell Skaggs-CS 900525COPPEIJ~ PUBLIC WORKS May 25, 1990 TO~ John Karlsruher, FROM~ Steven G. Goram, Ginn, Inc. Director of Public Wor Connell/Skaggs Drainage Project To follow up to our meeting today with Glen Hinkley regarding the above referenced matter, you are going to research Ginn, Inc. records and review the concerns expressed byMr. Hinkley. Those were: Pro rata be assessed at the time of development if the developer does not need to use the storm sewer system which will be constructed by Connell Development. Willow Lane future improvement in the form of a 37 foot back- to-back as part of a road system circulating traffic from Denton Tap around the Hinkley/Boorhem property and south to Sandy Lake Road. The construction method proposed will be designed sufficiently to accommodate vehicular traffic in the even roadway is constructed. Larry Davis will research the city records regarding the platting and approval of the High School and the Connell Skaggs Shopping Center to determine whether there is any official record or agreement as to city commitment regarding the Willow Lane through street south to Sandy Lake Road. Sheri Moino will attempt to make contact with the Boorhem's next week to schedule a date to meet and discuss the easement dedication for the storm sewer system. Please follow up to this request by May 31, 1990. SGG/sm