Connell Skaggs-CS 900308PACHECO KOCH Consulting Engineers Mr. Russell Doyle city Engineer City of Cop~ell P.O. Box 478 C~pell, Texas 75019 March 8, 1990 PK No: 1004-90.005 Re: Woodside Village (Connell Skaggs Ac]dition) Drainage Improvement Options Dear Mr. Doyle: We are sending you attached, via U.S. Mail, the following items: Cc~. ies Date 2 3-7-90 2 3-7-90 2 3-7-90 2 3-2-90 Description Sketch showing Drainage Option 1, 10'x 8' Box Culvert Sketch showing Drainage Option 2, Box Culv. and Channel Sketch showing Drainage Option 3, Cc~c. Channel Opinion of Probable Coastruction Cost for each Option These items are transmitted for your review and o~¥~nt. If the enclosures are not as noted, or if you have any questions regarding this matter, please do not hesitate to call me. J~K/t~j 1004-02 Sincerely, Koch, Jr., P.E. cc: Mr. W~rk Connell, Co,nell Dev. Co. w/enc. 1012 Park Central VII / 12750 Merit Drive / Dallas, Texas 75251 / (214) 450-4141 PACHEC0 KOCH 00NSULTING ENGINeerS 1012 Park Cemtral VII - 12750 Merit Drive Dallas, Te_xms 75251 PROBABLE OONSTRUC~ION COST S~r 1 OF 3 PROJ~ET: Woodside VillaEe - DrainaEe Improvements - West PL DATE: 3-2-90 Option 1 - 10'x 8' Box Culvert PREPARED BY: 3AK 1 1090 CY ConC.for 10'x 8' Box Culvert $325.00 $354,250 )0 2 1 LS Clearing and Excavation $68,350.0( 68,350 30 3 1 IS Fence Removal and Replacement 5,000.0( 5,000 ~0 4 4 FA 14' Curb Inlets 2,000.0( 8~000 DO 5 1 EA Type '¥' Inlet 3~000.(X 3~000 90 6 35 LF 30" Rein. Conc. Pipe 40.0( 1~400 DO 7 1 LS Upstream Transition 41~000.00 41~000 )0 8 1 IS Trench Safety 225~000.0~ 225,000 D SUB-TO~AL $700,000 ~ The quantities and prices shown hereon are an indication of the Engineer's opinion of probable ~IqGINEERING ( 8__%) 28,000 )0 construction costs associated with the referenced project and are NOT a guarantee of ipzlividual or ODNTINGENCY ( 0___%) 0 )0 total construction costs. TOTAL $728,000 ~ COPPELL HIGH SCHOOL A bJ EXISTING IO'xS' ~BOX CULVERT WILLOW LANE HINCKLEY EXISTING 20 FOOT DRAINAGE EASEMENT A BOORHEM PROPOSED lO'x8' '/---BOX CULVERT PROPOSED DRAINAGE EASEMENT B WOODSIDE VILLAGE [CONNELL DEVELOPMENT CO) SANDY LAKE ROAD 0 n F.- Z 0 I-- Z DJ E×,ST~.~ 20 FOOT DRAINAGE EASEMENT · I PROPOSED BOX CULVERT TYPICAL SECTION A-A EXISTING 20 FOOT DRAINAGE EASEMENT · PROPOSED DRAINAGE EASEMENT TYPICAL PROPOSED BOX CULVERT SECTION OPTION- NO. I ' WOODSIDE VILLAGE DRAINAGE IMPROVEMENTS JAK NONE ~-?-90 1004-90,005 PAC~ KOCH CONSULTING 1012 Park Central VII - 12750 Merit Drive Dallas, Texas 75251 OPINION OF PROBABLE ~ONSTRUCTION fDST · PK NO: 1004~90.005 SH~T ~ OF PROJECT: Woodside ViliaKe - DrainaKe Improvements -'West PL~ DATE: 3_2~9Q ~ 0Dtion 2 .- 2-12'X 4' bBC and Conc Lined Channel. PREPARED BY: JAK k'i'~M QUANTITY UNIT DESCRIPTION · UNIT TOTAL NO. PRICE ..... 1 .1030 CY Conc; for 2-12'x 4' Mult. Box Cul. $300.00 $309?000 00 2 1 LS Clearing and Excavation 20,000.00 20~000 00 3 1 LS Fence Removal and Replacement 10,000.00 1%000 00 4 4 FA i4' Curb Inlets 2,000.00 ~000 O0 5 35 LF 30" Rein. Concrete Pipe 40.00 1~400 00 6 1 IS Downstream Transition 157000.00 15~000 00 7 16900 SF Concrete Lined Channel 4.00 67~600 00 8 1 LS Concrete Headwall 4~000.00 4~000 00 ! 9 1 IS Trench safety 10~000.00 10,000 00 SUB-TOTAL ' $445,000 00 The quantities and prices shown hereon are an indication of the E~gineer's opinion of probable 51~GINEERING (10 %) 44,500 00 construction costs associated with the referenced -- project and are NOT a guarantee of individual or CONTINSENCY ( l0 %) 44~500 00 total construction costs. $534,000 00 SCHOOL lO Z ~J SECTION ~ PROPOSED 2-12'x4' EMU~LTIPLE BOX CULVERT SANDY LAKE ROAD TYPICAL PAc'..mcoa,...~ .,.... [,(oc[-[ WOODSIDE VILLAGE DRAINAGE IMPROVEMENTS JAK NONE :5-7-90 1004-90,005 PACMEC0 KOCH CONSULTING ENGIN,:M~S · 1012 Park central VII - 12750 Merit Drive Dallas, Texas 75251 OPINION OF PROBABLE CONSTRUCTION ODST PK NO: 1004-90.005 PR~: Woodside Village - Drainage Improvements -. West PL .... DATE: 0priori 3 -Conc. Lined Open Oaannel PREPARED BY: 3 OF 3. 3-2-90 3AK~ ITEM QUANTITY UNIT DESCRIPTION UNIT TOTAL NO. PRICE i 33,300 SF Conc~ Channel Lining $4.00 $133,200 00 2 1 LS Clearing and Excavation 40,000.00 40,000 00 3 1 IS Fence Replacement and Insta]]m~n 20,000.00 20,000 O0 4 35 LF 30" Rein. Conc. Pipe 40.00 1,400 00 5 1 · IS Downstream Transition 15,000.00 15,000 00 6 1 IS Trench Safety 10,000.00 10,000 00 SUB-TOTAL' $219,~00 00 The quantities and prices shown hereon are an indication of the Engineer's opinion of probable ENGINEERING ( 8 %) 17,570 construction costs associated with the referenced -- project and are NOT a guarantee of individual or CONTINGENCY ( 10%) 21,960 !00 total construction costs. $259,130 00 COPPELL HIGH SCHOOL A A EXISTING IO'x 8' CULVERT EXISTING 20 FOOT AINAGE EASEMENT '~lLLOW L~NE HINCKLEY BOORHEM PROPOSED CONCRETE LINED DRAINAGE CHANNEL PROPOSED DRAINAGE EASEMENT PROPOSED CONCRETE LINED /--OPEN DRAINAGE CHANNEL 0 IZ 0 Z Ld B WOODSIDE VILLAGE [CONNELL DEVELOPMENT COJ SANDY LAKE ROAD EXISTIND 20 FOOT DRAINAGE EASEMENT TYPICA,L SECTION EXISTING 20 FOOT DRAINAGE EASEMENT TYPICAL PROPOSED DRAINAGE EASEMENT SECTION OPTION~-NO. WOODSiDi VILLAiE DRAINAOE IMPROVEMENTS