Coppell Industrial-CS010614SENT BY: OITY OF COPPELL; gT~ GO4 704t; J~N-14-Ol.~g OOAM; PAGE 2/3
Pro t:
D~te:
DEVELOPMENT FEE TABLE
Coppell Industrial Add~on, Lot 1, Block A (Phase 1)
(Additional 2 " Irrigation Meter)
6/14/01
TOTAL
FEES DUE
~ Water Impact Fcc $3.600.00
(100% due prior, to Council Approval)
Water Tap Inspection Fee $50.00
( 100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $189.37
(100% due at Issuance of Water Meter)
Water Meter Deposit (DomeStic) $0.:00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $30.:00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0~00
(100% due prior to C.o. uncil Appro~.al)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final lnspe~iion Fee $0i00
(100% due at Issuance of Building Permit)
Park Fac '"
(100% due prior to Council Approval)
Roadway Impact Fee $0:00
(100% due prior to Council Approval)
S~reet Light Fee N/A
(100% due prior to Acceptance of Project
feet Sign Fee N/A
(100% duc prior to Acccptaace of Project
Construction Inspection Fee N/A
FOTAL $3,869o37
~£NT BY: C~TY OF COPP~LL; I ~. 972 304 704t; ~-~4-O~,.§:OOAM; PA~ ~/3
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell Industrial Addition, Lot I, Block A (Phase D(Additional 2~ Irrigation Meter)
DATE: 6/14/01
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Firellne Metar(s):
0 = 0 ESU's
I - 2 inch = ' ....8 ESU's
0 = 0 ESU's
0 -- 0 ESU's
Total #: 8 ESU's ~ $450.00 es.
(100% due pdor to Council approval of the final plat)
~3,600.00
Water Tap Inspection Fee:
Total #: 1 Connections ~ $50.00 ea.
(Single f~mily due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$50.00
Domestic Water Meter Fee:
Total #: 0 Domostic Meter(s) Q $0.00
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
$0.00
lrrigation/FlreHne Water Meter Fee:
Total #: 1 Irrigation Meter(s) ~} $189.3~'
Total #: 0 Additional Irrlgetion Meter(s) ¢~ S0.00
Total #: 0 Fireline Meter(s) (~ $0.00
(100% due prior to issuance of water meters)
$189.37
$0.00
$o.oo
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) ~ $35.00 ea.
(100% due prior to issuance of water meters)
$0.00
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) ~ 530.00 ea.
(100% due pdor to issuance of water meters)
$30.00
Wastewater Impact Fcc:
Total Domestic Meters ESU's:
~ $450.00 ea.
S0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections ~} $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (AH developments):
Total #: 0 Lots ~ $50.00 ea.
(100% due prier to issuance of building permit)
$0.00
Page 1
kENT BY: CTTV OF COPPELL; ~72 304 7041; 1-14-0 ~:OOAM; PAGE t
TO: ~ERV[CE CENTER AT: g72,G04,3547
COPPELL
P.o. B~x 478
col)pea, 'Ix ?~o19
P)'~ne:
F~:
ENGINEERING DEPARTMENT
FAX COVER SHEET
(including cover sheet)
i-]For Review [] Plmm~m Comment i-I Pleise Reply )~I~Ai Requested
IF YOU DO NO~"P~CF-ffE ,41.L OF ~ P,,iGES PI..F-~S,F, C,4,LL ('97;') 30~1..$679
"C~, of Copp~ll Engi~ming- E,~ell~ #y De,~iZn"