Coppell Industrial-CS011101~BNT ~Y: ~ITY OF COPPELL;
PROJECT:
DATE:
972 304 704t; NOV-t-0t 6:14PM; PAGE 2/2
W~te~ Im~ Fee:
I~i~tton Meter(e):
Firellne Meter(s):
0 = 0 ESU's
1 - 2 inch = -- 8 ESU's
0 · 0 ESU's
0 = 0 ESU'$
Total ~ 8 ESU's Q $280,00 ea.
(Due pdor to illulnce of building permit)
$2,240,00
Water Tap lnsp~tion Fee:
Total #: 1 Connections ~ $50.00 ea.
(Si-~*~'famlly due prior to issuance of building permit)
(All other developmonte due prior to issuance of meter)
$50.00
Dom~tic Water Meter Fee:
Total ~. 0 Domestic Metar{s) ~ $0.00
(Single family due prior to i~suance of building permit)
(All other developments due prior to issuance of meter)
$0.0o
lrrigatiou/FireUne Water Meter Fee:
T~al #: I Imgation Meter(s) ~} $205:28
Total #: 0 Additional irrigation Meter(s) ~ ~}.00
Total #: 0 Fimline Meter(s) ~ $0.00
(t00% due prior to luuence of water meters)
$205,28
$0.00
$0.00
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) ~ $30.00 ea.
(100% due prtor to issuance of water meters)
$0.00
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) ~ $30.00 ea.
$30.00
Wastewater Impact Fee:
Total Domeet~c Meters ESU's: , 0
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 0 Conne~ons O $50.00 ea.
(lO0~ue prior to issuance of building permit)
Utility Final Inspeetio# Fee (All developments):
Total ~ 0 Lots 0 $50.00 ee.
(l~ue prior tO i~uence of building permit)
Q$280.00ea.
$0.00
$0.00
$0.00
Page 1
~EN~ BY: CZTY OF COPPELL;
TO: ~ERV'[CE CENTER
972 384 7841
072 304 704t;
AT: §72,304,3547
NOV-t-01 6:14PM; PAGE 1/2
DEVELOPMENT FEE TABLE
Project: Coppell Industrial~4,t,4;~On, Lot 1, Bloc~ A (Phase 1) revised additional irri~ation meter
Date: ! 111/'2001
TOTAl, AI~OUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee S2,240.00
. (100% due at Issuance of Buildin~ Permit)..~ ~.~--
Water Tap Inspection Fee ' $50.00
(100% du, e at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $205.28
~100% d~ ~ ~ of W~ter Meter)
(I00~ due at l~uan~ ofW~r M~ter)
W~-t,water Impact Fee $0.00'
, (100% due at Issuance of Building Permit)
Wastewater Tap InSl~tion Fee $0.00
( 100% due ,at I, ,ssuance of Building P~nni0
Utility Final [napection Fee $0.00
{ 100% due at Iss...uancc of Buildin~ Permit)
Park Fee $0.00 $0.00
(100% duc prior to Council Ai~proval)
Roadway Impact Fee $0.00 $0.00
'(100% due prior to Council Approval)
Street Light Fee Information not Available
0oo% due prior to
Steer Si~n Fee Information not Available
0 00% to of Pro) 0 [ ,
'~tU~ti'Oll lnsp~tion Fee information not Available
~10o% due i~rior to Start of ConstrucU'on) ,,,
'rO~.~E~ $2,525.28
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00