Loading...
Coppell CC 1B1-CS001211DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NAT ON DATE: Coppell Commerce Ctr., Block 1R (Koll Center, F 800 Freeport Pkwy 12/11/00 SENT 12/12/00 2/2/01 12/12/00 2/2/01 2%,4% 12/12/00 1/16/01 2/2/01 ASSESSMENT ASSESSED FEE Park Fee Water Impact Fee = 15,525 Water Impact Fee (R) Wastewater Impact Fee 7,200 Wastewater Impact Fee (R) Street Sign AMOUNT PAID Street Light Construction Inspection Early Grading Permit fee $19,125.00 $19,125.00 $10,800.00 $10,800.00 $20,626.76 $3,149.74 Roadway Impact-Zone $48,842.89 Roadway Impact: 100% credit per Witt's Memo Roadway Impact Fee (R) $22,744.34 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection $350.00 $150.00 $568.11 $378.74 $105.00 $120.00 $150.00 Total Fees $127,110.58 TOTALS noti~ street dept. $20,626.76 $3,149.74 $48,842.89 $22,744.34 $350.00 $150.00 $568.11 $378.74 $105.00 $120.00 $150.00 Fees Paid $127,110.58 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Accepta As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. ~'~ase I) DATE 2/21/01 2/21/01 4/10/01 3/2/01 2/21/01 6/27/01 6/27/01 6/27/01 6/27/01 6/27/01 6/27/01 6/27/01 Amount Owed $o.oo nce