Loading...
Coppell CC 1B1-CS001211 (3)DEVELOPMENT FEES PROJECT NAME: Coppell Commerce Ctr., Block 1R (Koll Center, F ENGINEER: OR G NAT ON DATE: 12/11/00 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID Park Fee 12/12/00 Water Impact Fee = 15,525 2/2/01 Water Impact Fee (R) $19,125.00 $19,125.00 12/12/00 Wastewater Impact Fee 7,200 2/2/01 Wastewater Impact Fee (R) $10,800.00 $10,800.00 Street Sign Street Light 2%,4% Construction inspection $20,626.76 Early Grading Permit fee $3,149.74 12/12/00 1/16/01 2/2/01 Roadway impact-Zone $48,842.89 Roadway Impact: 100% credit per Witt's Memo Roadway Impact Fee (R) $22,744.34 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS ~0~- ,k$568.11 ~ \$378.74~ $105.00~ $120.00o TotalFees $127,110.58 notify street dept. $20,626.76 $3,149.74 $48,842.89 $22,744.34 $100.00 $0.o0 Fees Paid $125,448173 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Accepta As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. Phase I) I DATE 2/21/01 2/21/01 4/10/01 3/2/01 2/21/01 3/21/01 3/21/01 3/21/01 Amount Owed $1,661.85 nee T H · · C I T Y · 0 Ir ~orfubicWorks I Phone~ Re; cc;