Loading...
Coppell CC 1B1-CS010928T H E · G I T Y · 0 F September 28, 2001 M. Scott Ozymy, Vice President Koll Corporate Development 8411 Preston Road, Suite 700 Dallas, Texas 75225 RE: Coppell Commerce Center, Phase I Final Acceptance Dear Scott: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year mainteuance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector Ken Griffin, Director of Engineering Rhonda Brothers, Engineerin~ Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal