Coppell CC 1B1-CS010928T H E · G I T Y · 0 F
September 28, 2001
M. Scott Ozymy, Vice President
Koll Corporate Development
8411 Preston Road, Suite 700
Dallas, Texas 75225
RE: Coppell Commerce Center, Phase I
Final Acceptance
Dear Scott:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year mainteuance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.