Loading...
Conoco-CS 8709105400 Eenais.~nce Tower 1201 Elm Street Dallas, Texas 75270 DAUBS HOUS'roN AusmN WINSI' EAD McGUIRE SECHREST &MINICK A Pt~"~ional Corporation Attorneys & Couttselo~ September 10, 1987 (214) 742-1700 Telex 734105 ! Telecopier (2141 745-5390 745-5274 Mr. Alan D. Ratliff City Manager City of Coppell ..... 255 Parkway Boulevard .i"!i P. O. BOX 478 ...... : ..... ~ Coppell, Texas 75019 Dear Alan: Enclosed for your records is a fully executed copy of the Conoco Pipeline Agreement. If you have any questions in this regard, please feel free to call me. BRK/clk Enclosure Very truly you~.s,, .Barry ~. Kni,~ 152:D082787A.30 Conoco Pipe Une Compen¥ Southern Division 1909 Southwood Lake Chade~, LA (318) 491-~ June 3, 1987 ~'xt'~u MAIL R~eipt #P-477 843 481 Mr. Clyde L. Stifford DeShazo, Starek & Tang, Inc. 330 Union Station Dellas, TX 75202 cl'l'~ OF O~pp,:l ,~., TEXAS We have reviewed your r~vised plans for the construction of ~ Lane associa~ water line and drainage lines across the Conoco Pipe Line Company ("CPL"), formerly Continental Pipe Line O~,~any, cper~e~ Cc~-Dor Pipe Line C~,~any ("Con-Dor,,) 6-/rich high pr~ure petrole~ proc~3cts pipeline. AD~litionally, we have reviewed C~L,L~nts by Winse~, MC~, Sechrest & M/nick, Attorneys and Counsellors, to our letter of Jar~vy 30 and ha~e inoorporated them aocordingly. Conoco Pipe Line Company will permit construction across the pipeline upon the Developer, Contractor and City of Coppell agreeing to the following e e In order to c<~,~ly with Department of Transportation P~ations by which pipeline operations are governed, modifications to the line will be mde by CPL. ~he p~-u~sed construction will requir~ instal- lation of heavy-wall concrete coated pipe to provide prc~ion during road construction, drainage line installation and water line installation. A~ditionally, the concrete coating affords p~ct~ ion fr~, both static and dynamic loadings of tb~ new roadway as well as pro~ct~ ion during future maintenance of the new facilities. The cost of these mod/ficatioDs, estimated to be $28,000 as shown in Exhibit I, will be borne solely by the Developer. CPL will manage all work performed on the pipeline. No engineering wer~s, private or industrial dwellings, deep rooe~ plants, fences, other similar permanent structures will be allowed over any portion of the pipeline. Concrete ooa~ pipe will be installed under the road c~ussi~g, in aooordance with ANSI B31.4, "Liquid Petrole%mm Transportation Piping Systems,,, API RP 1102, "lqeooqu,~ended Practices for Liqu/d Petrole%a~ Pipelines Crossing Railroads and Highways,,, and Dep,~U[,ent of Transportation, Part 195 regulation 195.256. Co~cr~te co~_ pipe Mr. Clyde L. Stifford 'J%~le 3, 1987 Page 2 4e Se 7e 10. 11. ~t ~ the entire width of the pavement ar~ a m/nimum of 25 feet beyond the newly ccFu~_ruc~ facilities. At any paint al~3 tb~ pipeline where the e~_~ 9x~ profile will be lowered by the removal of earth, the (k~-Dor line must be lowered to a ~pth which provides a rain/mum cover of 36 ~ after by a minimum of 12 ind%es. Any utilities which parallel the pipe- line will maintain a min/~um separation 8~canoe of 15 feet fk~, the utilities outside wall to the outside of the (k~-Dor line. ~he Con-Dot line shall be ~ 20 feet during each borin~ un,er- neath the railroad ara/or pipeline. ~he bore ~11 be initiated on the north side of the railroad (c~site the (k~-Dor line). Ade- quate shorin~ a~ barricad/n~ shall be mintained in acoordanoe with ~ req~ i ~.-~tents. Developer will allow no material or equivalent to be used in the ~ struction which wuuld hinder or impair Co~-Dor's ability to safely Con-Dot retains the right to adequa~_ly mark its pipeline with permanent line markers to insure public safety and the future safe operation of the line and to meet Department of Transportation Regulation. CPb's District Office in Iake O~arles, Ix~u~iana, must be provid~ with final oo~struction drawings for all work which will affect the Con-Dor pipeline, includ/ng a present plat and a profile (along the pipeline centerline) showing any ~de work to be done. The profile should show the vertical d/stance between the Con-Dor line and any Befora proc~/ng with any pipeline construction to aocc~moda~ Developer,s request, Con-Dor will re~.~e that 100 percent of the cash equivalent of the cost estimate be paid prior to oonstruction. Ap~~y 60 days will be r~ired for c~,~letion of pipeline modifications after receipt of the cash advanoe. The Developer will be chaz~ed actual costs for construction, whether higher or lower than the estimated costs. Ac'b,~,l ~osts will include all construc- tion costs, ~verh~d and lost revenue due to downtime. All struction work which is requ/red shall be performed by o~e of Con-Dor,s contractors. Con-Dot reserves the right to have an inspector on the j~b at all times to oversee all construction on or ~ear the pipeline. rko-Dot requ~es a minimum of 48 hours notice prior to any e~ca- ration, construction, or ~Dvement of equipment across its right of way so that its line can be staked to minimize the possibility of .Mr. Clyde L. Stifford Ju~e 3, 1987 Page 3 12. 13. 14. 15. 16. aocidental damage. Additionally, Co~-Dor persoD/~ Xml~t be ~ site during expcsur~ of the pipeline and during any work around the Developer shall ind~dfy and hold ConDor harm/~ from and against any an~ all claims for injuries to person or persons or for damages to prcgerty arisin~ ~cly or indirectly f~ tb~ negligent performance of work by Developer or those under-cc~tract, to DeveloD- er within twenty-five (25) feet of the oenterline of the Cc~-Dor pip~. ~ne Cc~tractor shall indemnify and hold (~-Dor harmless ~ ar~ against any and all claims for injuries to person or persons or for damages to property arising directly or indirectly f~ the negli- gent performance of work within twenty-five (25) feet of the oent~rline of the Oon-Dor pipeline by the COntractor or its sub- The city of Cu~_ll shall inde~tify and hold Cc~-Dor harmless ~ and against any and all claims for injuries to per~ or persons or for damages to property arising ~cly or ~y fA.-- the negligent performance of i%ature work by the City of Cu~a~ell, it's terms of th/s a~ement. ConDor shall ~,,,,ify ~ hold Developer and the City of Cu~ell harmless f~.,,.,u ~ ac3a~ eun¥ ~ all claims for injuries to person or persons or for damages to property arising d{wectly or fz~, the negligent performance of the work by ConDor, it's em- ~s of this Agre~nt. ConDor shall be named as ~tio~ml insured without any 9,~lifica- tions or restrictions by the ~ontractor performing work near the Oon-Dor pipeline. Contractor shall maintain in effect durir~ work near the Con-Dor line the following insurance coverages: Public liability insurance covering ell work to be performs~ near the pipeline, with bodily injury limits of.not less than $100,000 as to any one person ar~ $300,000 as to any o~e accident and with p~operty damage limits of not less than $100,000 for each accident. Such insurance shall include ooverage for all liability assumed by Contractor working near the pipeline under contract with the Devel- oper with limits of liability not 1~ than those set cut above. It shall be Developers ~bligati~ to s~e that each an~ every tractor and subcontractor ~,~loyed by it carries and pays for the sam~ kinds and amounts of insurance as ar~ required of the C~ tractor. Mr. Clyde L. Stifford June 3, 1987 Page4 A ~tified copy of all insuranoe policies requ~ ~all be r~ce~ived at the CPL office in Ta~ (harles with Cc~-Dor Pipe L~ne O~,~ny named as the certificate holder prior to the cc~mm~zm~ent of work. To initiate work on the pipeline modificaticDs to aoc-~-~-~,date the construction, please have a cc~y of th~ letter e~_~ed by an officer of the Developer, the Contractor and the City of (k4a~-ll and return to me along with final construction drawings and a check in tb~ am~mt of the should you have any qu=~tic~, pl~ call me at (318) 491-5851. Nell P. ~~ Di~i~ ss/os.ms cc: T. E. Souls J.-T. Rau M. M. Taylor S. W. RudolDh J. J. Jones $ 4,700 14,300 3,900 5.100 $28,000