Loading...
Coppell CC 1B1-WO010621 (2) ~ WATER /'"~ Issued: ~e',,~/' bed: Employee: Grid map: Phone Numbs: Check for: Accuracy test: Meter Leak: Initial meter relocation inspections Check water pressure: Re-read 2. Reoair 3.~ 4. Other Backflow Insp. Bldlow Cert. Date Re-Cert. Date A. Main Line B. Valves C. Service Line D. Hydrants B. Water Tower C. Samples D. Equ~-pment E. Safeb/ A. Line Locate B. Line Locate C. Tap D Excavalion 5. Reason for failure: A. Electrolysis B. New Conslmction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Banicades B. Cones C. Tape D. Lights E. Other 7. If Meter/service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM __ B. Was Water Metered: Yes C. Was Customer Notified: Verbally Fir~ plug flushing Total G-allous No Doorknocker - 8. If Meter Change Out: VehiclefEquipment Used Unit # Miles Hrs Equipment A. Old Meter # Reading B. New Meter # Rending C. Old Meter Size/Type: £. Type of work performed or findings: D New Meter Size/Type 9. If mainline or deep service repair, descn'be type of pipe or service line a~d condition/ 10. Man-hours: 11. List Materials Used: Crew Members. 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water U~ilities meter inspection: pass or fail 14. How many trips to do task? Si nature