Loading...
ST9302-LR001026 (3)ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 10/26/00 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-166B PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. i SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 544 10/26/00 FG 8L 22.2 94.7 22.7 96 101 3-A 545 10/26/00 FG 8L 22.2 94.7 24.1 94 99 3-A 546 10/26/00 FG 8L 22.2 94.7 25.2 95 100 3-A 547 10/26/00 FG 8L 22.2 94.7 25.0 94 99 3-A 548 10/26/00 FG 8L 22.2 94.7 25.7 95 100 3-A 549 10/26/00 FG 8L 22.2 94.7 24.5 97 102 3-A 550 10/26/00 FG 9L 18.1 107.3 20.3 102 95 3-A TEST LOCATION: 544 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON LEFT 1/4 POINT AT STATION #31+50 545 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON CENTER LINE AT STATION #32+50 546 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON RIGHT 1/4 POINT AT STATION #33+50 547 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON CENTER LINE AT STATION #34+50 548 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON LEFT 1/4 POINT AT STATION #35+50 549 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON CENTER LINE AT STATION #36+50 550 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON RIGHT 1/4 POINT AT STATION #37+50 CC: NONE I FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~/~ 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C PER.CENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Cons Itin