Coppell Trade-CS050127DEVELOPMENT FEES
=ROJECT NAME: Coppell Trade Center, Lot 1 Block 1
ENGINEER: Macatee Engineering
3RIGINATION DATE: 1/27/2005 PRELIMINARY
SENT ASSESSMENT ASSESSED FEE AMOUNT PAll: DATE
$5,180.00
$2,240.00
Water Impact Fee
Wastewater Impact Fee
Park Fee n/a
Roadway Impact-Zone
Street Sign
Street Light
$62,413.86 $31,206.93 rb 3/23/2005
Construction Inspection $11,445.13
Fire vaults (2%) $420.00
EG or Bore Permit
Ovedime Inspection
Water Tap Inspection $200.00
Wastewater Tap Inspection $50.00
Water Meter (Domestic) $211.72
Water Meter (Fire/Irrig) $6,954.14
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/Irrig) $90.00
Utility Final Inspection $50.00
~Subtotal to En~.
$11,445.13 pc 3/24/2005
$420.00 RB 3/28/2005
$100.00 mc 3/29/2005
$6,742.42 mc 3/29/2005
$60.00 mc 3/29/2005
$50.00 mc 3/29/2005
$74,278.99 $43,072.06 $31,206.93
TOTALS
TotalFees Fees Paid Amount Owed
$89,284.85 $50,024.48 $39,260.37
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.