Loading...
Coppell Trade-CS050127DEVELOPMENT FEES =ROJECT NAME: Coppell Trade Center, Lot 1 Block 1 ENGINEER: Macatee Engineering 3RIGINATION DATE: 1/27/2005 PRELIMINARY SENT ASSESSMENT ASSESSED FEE AMOUNT PAll: DATE $5,180.00 $2,240.00 Water Impact Fee Wastewater Impact Fee Park Fee n/a Roadway Impact-Zone Street Sign Street Light $62,413.86 $31,206.93 rb 3/23/2005 Construction Inspection $11,445.13 Fire vaults (2%) $420.00 EG or Bore Permit Ovedime Inspection Water Tap Inspection $200.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $211.72 Water Meter (Fire/Irrig) $6,954.14 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $90.00 Utility Final Inspection $50.00 ~Subtotal to En~. $11,445.13 pc 3/24/2005 $420.00 RB 3/28/2005 $100.00 mc 3/29/2005 $6,742.42 mc 3/29/2005 $60.00 mc 3/29/2005 $50.00 mc 3/29/2005 $74,278.99 $43,072.06 $31,206.93 TOTALS TotalFees Fees Paid Amount Owed $89,284.85 $50,024.48 $39,260.37 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.