Loading...
Coppell Crossing L1-CS 980505COPP~LL, TEXAS 75019 RO. Box 478 CoppelL Texas 75019 972-462-0022 May 5, 1998 ·Mitch Vexler Mockingbird Management Co. P.O. Box 293053 Lewisville, TX 75029 RE: Coppell Cr~ Addition, Lot 1, Block 1 Development Fee Assessment Dear Mr. Vexler: Enclosed is a revised copy of the City of Coppell Development Fee Assessment Table. No payment is required at this time. Paragraph 14 of the CED Settlement Agreement approved by City Council on June 12, 1997 waives up to $51,000.00 of fees for this property during the initial two-year time frame after approval. Please refer to a~aehed table for additional fees. Also, provide a copy of the Engineer's estimate or conWact to our office so the construction inspection fee can be verified. Construction inspection fees and building permit fees may also be waived until such time as the $51,000.00 has been exhausted. The attached Fee Table waives $42,883.15 of the $51,000.00. This leaves a balance of $8116.85 that could still be waived prior to June 12,1999. If you have any questions, please contact me. Sincerely, . ~ .. Director of Engineering and Public Works. Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE Project: Coppell Crossing Addition, Lot 1, Block Date: 4/24/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee * $5850.0~ * (100% due prior to Council Approval) Water Tap Inspection Fee * $150.0~ (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) * $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) * $2940.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee * $3600.00 * (100% due prior to Council Approval) Wastewater Tap Inspection Fee * $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee * $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee * $30051.00 * (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts I~OTAL $95.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 * Fees in the total amount of $ 42,883.15 waived per paragraph 14 of the CED Settlement Agreement approved by City Council on 6/12/97.