Coppell Crossing L1-CS 980424COPPELL, TEXAS 75019
Mitch Vexler
Mockingbird Management Co.
P.O. Box 293053
LewisviHe, TX 75029
Coppell Crossing Addition, Lot 1, Block 1
Development Fee Assessment
Dear M Verier:
P.O. Box 478
Coppell, Texas 75019
972-462-0022
April 24, 1998
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppeil in the am $39,501.00 and forward to the
Finance Department along with a copy of the Fee Assessment table.' This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerel~/)]~~ ~
Michael A. Martin
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
. Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TAdLE
Project: Coppell Crossing Addition, Lot 1, Block 1
Date: 4/24/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,850.00 $5,850.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $192.15
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,940.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee II $50.00
(100% due at Issuance of Building Permi0
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $30,051.00 $30,051.00
(100% due prior to Council Approval)
: Street Light Fee Information not
(100% due prior to Acceptance of Proje¢ available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Proje~ available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $42,978.15
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $39,501.00
uEVELOPMENT FEE WORKSm .-:ET
PROJECT Coppell Crossing Addition, Lot 1, Block 1
DATE: 4/24/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
I - 2 inch = 8 ESU's
1 - 1 inch = 2.5 ESU's
= ESU°s
I o 8 inch = 2.5 ESU's
Total #: 13 ESU°s @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $192.15
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (IrrigationfFireline):
Total #: 1 Irrigation Meter(s) @ $57.75
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @ $2,882.25
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: I Meter(s) @ $35.00 ea.
( 100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Metar(s) @ $30.00 ea.
( 100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
8 @ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due pdor to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 0: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$5,850.00
$150.00
$192.15
$57.75
$0.0o
$2,882.25
$35.00
$6o.oo
$3,600.00
$50.00
$50.00
Page 1
UEVELOPMENT FEE WORK$.EET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
Single-family @ $1285.00 / Lot
Multi-family ~ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292,60 per light will be assessed.
( 100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$30,051.00
Information not
available at this time
Street Sign
Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development conuncts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Coppell Crossing Addition, Lot 1, Block 1
4/24/98
ROADWAY IMPACT FEE;
Service Area *
Sategory **
Land Use **
Buildiag Size (Sq. Ft.)
~)evelopment Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x {Fee per Vehicle Mile) =
0
Commercial
Shoppin~ Center
+ 21,000
21
4.77
$30O
$30,051.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
+ Includes 2 buildings (9,000 & 12,000 Sq. Ft.)
I AMOUNTDUE: $3o;o5,r, ooI