Loading...
Coppell Crossing L1-CS 980424COPPELL, TEXAS 75019 Mitch Vexler Mockingbird Management Co. P.O. Box 293053 LewisviHe, TX 75029 Coppell Crossing Addition, Lot 1, Block 1 Development Fee Assessment Dear M Verier: P.O. Box 478 Coppell, Texas 75019 972-462-0022 April 24, 1998 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppeil in the am $39,501.00 and forward to the Finance Department along with a copy of the Fee Assessment table.' This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerel~/)]~~ ~ Michael A. Martin Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician . Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TAdLE Project: Coppell Crossing Addition, Lot 1, Block 1 Date: 4/24/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,850.00 $5,850.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,940.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee II $50.00 (100% due at Issuance of Building Permi0 Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $30,051.00 $30,051.00 (100% due prior to Council Approval) : Street Light Fee Information not (100% due prior to Acceptance of Proje¢ available at this time Street Sign Fee Information not (100% due prior to Acceptance of Proje~ available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $42,978.15 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $39,501.00 uEVELOPMENT FEE WORKSm .-:ET PROJECT Coppell Crossing Addition, Lot 1, Block 1 DATE: 4/24/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 2 inch = 8 ESU's 1 - 1 inch = 2.5 ESU's = ESU°s I o 8 inch = 2.5 ESU's Total #: 13 ESU°s @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (IrrigationfFireline): Total #: 1 Irrigation Meter(s) @ $57.75 Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ $2,882.25 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: I Meter(s) @ $35.00 ea. ( 100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Metar(s) @ $30.00 ea. ( 100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due pdor to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $5,850.00 $150.00 $192.15 $57.75 $0.0o $2,882.25 $35.00 $6o.oo $3,600.00 $50.00 $50.00 Page 1 UEVELOPMENT FEE WORK$.EET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: Single-family @ $1285.00 / Lot Multi-family ~ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292,60 per light will be assessed. ( 100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $30,051.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development conuncts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Crossing Addition, Lot 1, Block 1 4/24/98 ROADWAY IMPACT FEE; Service Area * Sategory ** Land Use ** Buildiag Size (Sq. Ft.) ~)evelopment Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x {Fee per Vehicle Mile) = 0 Commercial Shoppin~ Center + 21,000 21 4.77 $30O $30,051.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) + Includes 2 buildings (9,000 & 12,000 Sq. Ft.) I AMOUNTDUE: $3o;o5,r, ooI