Coppell Cross L2-CS 990505 (2)DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Crossing Addition, Lot 2, Block I DATE: 5/5/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 16 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $192.05 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.05 Total #: 0 Additional Irrigation Meter(s) @ $0,00 Total#: ' 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. $7,200.00 $100.00 $192.05 $192.05 $0.00 $0.00 $35.00 $30.00 $3,600.00 $50.00 $50.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $31,421.25 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Copper Crossing Addition, Lot 2, Block 1 5/5/99 ROADWAY IMPACT FEE: Service Area * 7 Category ** Office Land Use ** General Office Bldg. Building Area (sf) a. 26,250 Development Units ** 26.25 Venicle Miles per Developmem Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $31,421.25 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Building 1 = 14,000 S.F. Building 2 = 12,250 S.F. I AMOUNTDUE: $31,421.25