Loading...
Coppell Cross L3-CS 990715COPPELL UTILITIES DIVISION DATE: TIME: TO: FROM: RE: July 15, 1999 Listed below are Utility Division comments 1. Item #1-Loop OK but no curbstop. Garreth Campbell, Construction Inspector Danny Hightower, Utilities Division Followup Walk-thru Coppell Crossing (Burger King) relative to walk thru. 2. Item #2-Still needs to be reset, needs curbstop. 3. Still no paperwork on both doublechecks. 4. Item #4 and #5 OK. 5. Item #6-no curbstop on domestic or irrigation. 6. In meter boxes doublechecks need cap on ball valves. MESSAGE CONF I RMAT I ON 87/16/99 08:09 ID--CITY OF COPPELL DATE 07,16 S,R-TIME 00~20" DISTA~4T STATION ID MODE CITY OF COPPELL CALLING PAGES RESULT O1 OK 0000 3-'99 21~ 50~ ~570 C~TY 0~ C0~PELL ENGiNEEriNG ~ C~TY 0~ C0PPELL CiTY OK Cl3;=~'~LL + CiTY ~ COP~ELL N0.098 [~01 TO: FROM: 1:00 P.M. Garreth Campbell, Construction Inspector Danny HighCower, Utilities Division Walk-thru Coppell Crossing (Burge~ King) Listed l~elcw are Utility Division comments relative to walk thru. l. 1-__~__/_2" DomestiC, meters must have a loo[3 System. N__~ ?aperwork ye~ on both doUbieGhecks. Reg__'_ol~_~ pipe s~ubbed into manhole. The=.. is a meter leak on the CitZ side la irrigation. Clean out meter ca,.ns and doublecheck boxes.