Loading...
ST9302-LR001025 (2)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Do#os, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-80__23 REPORT OF FIELD COMPACTION TESTS TESTED FOR CITY OF COPPELL DATE 10/25/00 COPPELL, TEXAS PROJECT SANDY LAKE ROAD OUR REPORT NO. 98881-163A PROJECT NO. ST 93-02 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~.~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % P~F % PC, F 523 10/25/00 FG 9L 18.1 107.3 20.7 106 99 3-A 524 10/25/00 FG 10L 16.6 110.3 18.0 107 97 3-A 525 10/25/00 FG 10L 16.6 110.3 17.9 109 99 3-A 526 10/25/00 FG-3.0 5 13.5 111.9 14.2 111 99 1 -A 527 10/25/00 FG-2.0 1 12.5 117.9 14.4 114 97 1-A 528 10/25/00 FG-1.0 I 12.5 117.9 13.8 115 98 1-A 529 10/25/00 FG I 12.5 117.9 14.9 115 98 1-A TEST LOCATION: 523 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON CENTER LINE AT STATION #51+00 524 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON RIGHT 1/4 POINT AT STATION ~52+00 525 PAVING ON EAST BOUND LANE OF SANDY LAKE ROAD ON CENTER LINE AT STATION #53+00 526 48" STORM DRAIN ON EAST BOUND SIDE OF SANDY LAKE ROAD AT STATION ~0+65 527 48" STORM DRAIN ON EAST BOUND SIDE OF SANDY LAKE ROAD AT STATION #60+70 528 48" STORM DRAIN ON EAST BOUND SIDE OF SANDY LAKE ROAD AT STATION ~60+75 529 48" STORM DRAIN ON EAST BOUND SIDE OF SANDY LAKE ROAD AT STATION ~60+80 CC: NONE 1. FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTIO~ COMPLY WITH SPECIFICATIONS 2., NA3URAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS itte 3; LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 41 CEMENTTREA~-D D. RETEST , IN Geotecl~nical Engineering · Construction Materials Testing · Environmental Engineering