Walk-thru Coppell Crossing Block 1, Lot 4
e
4.
5.
6.
7.
8.
e
10.
Note:
Reset meter can on blow off; place dirt around can at ground level.
Plane call for 2" water meter service. 1" meter was installed; no 2" bypass in place on
1" meter loop. In order to have 1" meter, it must be approved by City on As Built
plane and service must be changed to 1".
Mark in blue MLV on curb.
Mark in red FHV on curb.
Place blue marker in street to mark FH.
Mark on curb MH in red at all manholes.
2~ manhole from back of building must be sealed.
2~d manhole needs to be grouted at pipe into manhole to stop inflow from ground
water.
Locate covered nmnhole on 30" sewer ]hie and call 972-304-3545 to check for work
needed after locate.
Place chimney seal on sewer manhole ronnlng 18" sewer line.
Call 972-304-3~5, Danny Hightower, when ready for follow-up walk-thru.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE CONFIRMATION
04×19×01 12:29
IDzCITY OF COPPELL
DATE
04x19
S~R-TIME DISTANT STATION ID
00~3" CITY OF COPPELL
MODE PAGES
CALLING
RESULT
OK 0000
21, '04 35?0
04×17×01 14:54 CITY _ COPPELL ENGINEERING ~ CITY OF COF'PELL NO. 11G
April 17, 2001
Mike Macaluso
Terra Builders, L.C.
2200 Morris Rd., Ste. 310
Flower Mound, Texas 75028
RE: CoPl~l Cro~i~ illock 1, Lot 4
Dear Mil<e:
Please be advised that a walk-through has been scheduled for Tlmrsflay, April 19, 2001 at 9:00
a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call 972-30~-3685 at your earliest convenience.
Sincerely,
Constxuction Inspector
cc: Mike Martin, Assistant City Engineer
Rhonda Brothers, Engineering Secretary
~ Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Lee Stone, Commercial Inpector