Loading...
Coppell Cross L4-CS001012 T H E ' ¢ I T Y - 0 F C-OPPELL October 12, 2000 Mitch Vexler Mockingbird Management Company P.O. Box 293053 Lewisville, TX 75029 RE: Coppell Crossing Addition, Lot 4, Block 1 Fee Assessment Letter Dear Mr. Vexler: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the mount of $14,720.40 and forward to the Finance Depa~ment along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. ~.~;rely, Michael A. Martin, P.E. Assistant City Engineer CCi Jennifer Armstrong, Finance Director Debbie Ingrain, Secretary Glenn Hollowell, Assistant Director of Public Works :' Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: CoppellCrossing Addition, Lot 4, Block 1 Date: 10/12/00 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $1,575.00 $1,575.00 (100% due prior to Council Approval) Water Tap Inspection Fee ¥~a$100.00~ (100 % due at Issuance of Water Meter) ~ - Water Meter Fee (Domestic) ~ ~ ~.74' (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.0~ (100 % due at Issuance of Water Meter) Wastewater Impact Fee $ I, 125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $12,020.40 $12,020.40 (100% due prior to Council Approval) Street Light Fee Information not Available (100 % due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee $2,558.70 I'OTAL $17,633.41 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $14,720.40 PROJECT: DATE: DEVELOPMENT FEE WORKSHEET CoppellCrossing Addition, Lot 4, Block I 10/12/00 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): 1 - 1 inch = 2.5 1 - 5/8 inch X 3/4 inch = 1 0 = 0 Fireline Meter(s): 0 = 0 Total#: 3.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: -- Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $62.74 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) ,'rigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $26.57 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 2.5 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) ~xTtility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $1,575.00 $100.00 $62.74 $26.57 $0.00 $0.00 $35.00 $30.00 $1,125.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 2 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $o.oo $12,O2O.4O Information not Available -~treet Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. $2,558.70 * The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) · Based on attached information faxed to the City Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Crossing Addition, Lot 4, Block 1 10/12/00 ROADWAY IMPACT FEE: Service Area * 7 Category ** Commercial Land Use ** Shoppla~ Center Building Area (sO 8,400 Development Units ** 8.40 Vehicle Miles per Development Unit ** 4.77 Fee per Vehicle Mile *** ~- $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $12,020.40 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) ~14 355 1948 04:38PM OFFICE CEMTER OCT 1~ ~00 P.1 BUILDERS,- . Commercial Cons~ction & Development FAX COVER SItEET FAX # TO: City of Copper Engineering Dept. ATTN: FAX #: Mike Martin 972-304-3570 FROM: Dennis Wills Number of pages (including cover shee0: One SUBJECT: Coppell Crossing Lots 4~ Mike: Here is the information you requested in order to assess the impact and inspection fc~s. Lot #4: 8,400 SF 1" Domestic water meter 5/8" Irrigation meter S 118,945 total private improvement cost $4,495 total public improvement cost 4,990 SF 1" Domestic water meter meter private improvement cost No cost Please fax Impact and Inspection ~ertics :s to you early next week. IF YOU HAVE ANY PROBLEMS RECEIVING THIS FAX, PLEASE CALL (972) 355-1014 help. 2200 M~U gz~d. Sma 310, l~ower Mo,a~. T~u 7~025 pho~c 9'/2.3~.101¢ f~x 972 3~.1940