Loading...
Coppell Pro-CS 970416April 16, 1997 MEMO TO: FROM: RE: Garreth Campbell, Construction Inspector Brent Adams, Street Division Coppell Professional Plaza Follow Up Walk-Thru April 15, 1997 The following items were found to be incorrect: 2. 3. 4. Drop inlet north end of project on Denton Tap, regrout on inside. Drive approach on south side of project seal all saw joints and curb returns. Brick pavers too low and puddle on south side of drive in pavers BFR. Clean curb line.