Loading...
Coppell Pro-CS 960313 he City With A Beautiful Future March 13, 1996 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Teri Jones Dowdy Anderson 16250 Dallas Pkwy. Suite 11313 Dallas, Texas 75248 RE: Couuell Prof,~ional Plaza Development Fee Ass~ment Dear Teri Jones: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Coppell Professional Plaza. Please make payment to the City of CoppeH in the mount of $11.925.00 and forward it to lermifer Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Per Bira~H, Sic/Si{ual Technician Rick Wieland, Parks Development Coordinator CITY OF COPI~.LL ~ DEVELOPMENT FEE~ Date: March 13, 1996 Project: Coppell Professional TOTAL AMOUNT DUE FEF_~ D~ PRIOR TO COUNCIL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 150.00 (100% clue at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 60.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 2,776.88 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow (100% due prior to Council Approval) Comtruction Insp~'tion Fee n~l submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $15,192.86 $11,925.00 TOTAL AMOUNT DU~ PRIOR TO COUNCIL Ai~ROVAL * ThisfeecaanotbemmeaeduntilaRerTUElecUiesubmitsthelighfingplmfotthe~j~t' O~th~phn is submitted, $292.60 per light will be assessed. COPPing. ENGIN~m~-NG HEHORANDON DATE TO: FROW RE: March 13, 1996 Mike Martin, Assistant City Engineer Howard Pafford, Utilities Superintendent Development Fees for Cop~ell Professional Plaza The following fees referenced project. Water Impact Fee: 1 ~" 8" Total ~8.5 should be assessed and collected on the above Domestic Meter/s = ~ ESU's Irrigation Meter/s I ~ ESU's Fireline Meter/s ~ 2.5 ESU's 100% due prior to Council approval ESU's ~ $450.00 ea = S 8.325.00 of the final plat. Wastewater Impact 1 - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's ~ $450.00 ea = $3.600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections ~ $50.00 each = S 150.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee N/A Connections ~ $50.00 each - $ 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) ~ lots ~ ~ = S50.0~__ 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 2" Domestic Meters ~ .__~= $195.98 100% due prior to issuance of building permit for residential only. All other development fees are due prior to issuance of meter/s. Water Meter Fee 1 - 2" 1 - 8" (Irrigation/Fireline) Irrigation Meter/s Fireline Meter/s ~ sz95.9 Total $3.776.88 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters ~ $30.00 ea = $60.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $ $5.00 100% due prior to issuance of water meters.