Coppell Pro-CS 960313 he City With A Beautiful Future
March 13, 1996
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Teri Jones
Dowdy Anderson
16250 Dallas Pkwy.
Suite 11313
Dallas, Texas 75248
RE: Couuell Prof,~ional Plaza
Development Fee Ass~ment
Dear Teri Jones:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for the Coppell Professional Plaza.
Please make payment to the City of CoppeH in the mount of $11.925.00 and forward it to lermifer
Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Ted Dutt, Interim Utilities Superintendent
Per Bira~H, Sic/Si{ual Technician
Rick Wieland, Parks Development Coordinator
CITY OF COPI~.LL ~
DEVELOPMENT FEE~
Date: March 13, 1996
Project: Coppell Professional
TOTAL AMOUNT DUE
FEF_~ D~ PRIOR TO
COUNCIL
Water Impact Fee $8,325.00 $8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 150.00
(100% clue at Issuance of Water Meter)
Wastewater Impact Fee 3,600.00 3,600.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) 195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) 60.00
(100% due at Issuance of Water Meter
Water Meter Fee (Irrigation & Fire) 2,776.88
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00
(100% due at Issuance of Water Meters)
Street Sign Fee
(100% due prior to Acceptance of Project)
Street Light Fee * information not
(100% due prior to Acceptance of Project) available
Park Fee
(50% due prior to Council Approval)
(50% due prior to Issuance of Building Permit)
Street Escrow
(100% due prior to Council Approval)
Comtruction Insp~'tion Fee n~l submittal of
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $15,192.86 $11,925.00
TOTAL AMOUNT DU~ PRIOR TO COUNCIL Ai~ROVAL
* ThisfeecaanotbemmeaeduntilaRerTUElecUiesubmitsthelighfingplmfotthe~j~t' O~th~phn
is submitted, $292.60 per light will be assessed.
COPPing. ENGIN~m~-NG
HEHORANDON
DATE
TO:
FROW
RE:
March 13, 1996
Mike Martin, Assistant City Engineer
Howard Pafford, Utilities Superintendent
Development Fees for Cop~ell Professional Plaza
The following fees
referenced project.
Water Impact Fee:
1 ~"
8"
Total ~8.5
should be assessed and collected on the above
Domestic Meter/s = ~ ESU's
Irrigation Meter/s I ~ ESU's
Fireline Meter/s ~ 2.5 ESU's
100% due prior to Council approval
ESU's ~ $450.00 ea = S 8.325.00
of the final plat.
Wastewater Impact
1 - 2" Domestic Meter/s = 8 ESU's
Total 8 ESU's ~ $450.00 ea = $3.600.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections ~ $50.00 each = S 150.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
N/A Connections ~ $50.00 each - $
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
~ lots ~ ~ = S50.0~__
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 2" Domestic Meters ~ .__~= $195.98
100% due prior to issuance of building permit for residential only.
All other development fees are due prior to issuance of meter/s.
Water Meter Fee
1 - 2"
1 - 8"
(Irrigation/Fireline)
Irrigation Meter/s
Fireline Meter/s ~
sz95.9
Total $3.776.88
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters ~ $30.00 ea = $60.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
1 Meters ~ $35.00 ea = $ $5.00
100% due prior to issuance of water meters.