Coppell Greens 1-CS 990912To:
From:
Date:
RE:
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
Garreth Campbell, Construction Inspector Engineering
Avery Rodgers, Streets Division Public Works
September 12, 1999
Walk-thru Denton Tap & Coppell Greens I
1. At the entrance of Denton Tap and Copper Greens, street needs new sealer.
2. Cracks ali over - rout and seal.
3. Holes in concrete with mud - clean and seal.
4. Curbs need to be sealed from gutter to back of curbs.
5. Street is ponding bad in cul de sac. Contractor tried to grind but didn't work. Needs to
be replaced.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT