Coppell Greens 1-CS 990510E~5/ll '~q ~i'. El[ ,?F , I, P';iLL ENGIHEEP!~G ' ,SI r~ OF COPF'ELL h,0.~24 [~81
Prepar~e(~l by ~
Approve. c] by
IFIr, JND:
CITY OF COPPELL
JOURNAL ENTRY
DATE:, ,~-~-~ ~__
J,E. NO .........
POSTED BY: ...........
DAT E: ___ _
DE SISRJP [ION
Post. R° Fax !,olt
ACCOUNT
NUMBER
Tt'~TA I
DR.
E}5 11'~q ~1'1 ~ Ci~: !~IF' ,:1 ':'F'EiLL E Gl 4EEFIt,IG ~ ,TiT~' OF COPPEI L N0.724
DEVELOPMENT FEE WORKSHEET
PRO,JECT: Copp,:lt Greens, Phase l (Change in irrigation meter sizes & additional irrigation meters)
DA1 I,;: 5/519 ?
Wat,e~- Impact Fee:
Domestic Me[er(s)
ItTigat ')n Meter(s):
0 = 0 ESU's
5 - 2 inch = 40 ESU's
2 - 1 1/2 inch = 5 ESU's
2 - I inch -5 ESU'$
I - 2 inch -8 ESU's
Fire r ~ I~el'er(s)' 0 = 0 ESU's
-r o,:a,i #: 32 ESU's (7} $450.00 ea.
(100% due prior to Council approval of the final plat)
$14,400.00
wat~ex Tap lnspectiot! Fl;e:
~ ~[~i #: 7 Connections @ $50.00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior Ia ~ssuance of meter)
$350~00
Domestic Water NI~ter Fee:
)t~ I #: 0 Domestic Meter(s) ~ $0.00
(Single family due prior to ~ssuance of buildin9 permit)
(All other developments due prior to issuance of meter)
$0.00
IrriEation/Fireline '~Vafcr Meter Fee:
'" ~[~i #: 5 rrrigation Meter(s) @ $192.05
¢o~ #: 2 Addit'onat Irngation Meter(s) (~ $135.66
'ot¢~ #: 0 ~'ireh~e Meter(s) @ $0.00
{100% due prior to issuance of water meters)
$960.25
$271.32
$0.00
Doltt,stic Water Me[er Deposit Fee:
~ at;, #: 0 Meter(s) @ $35.00 ea.
{100% due prior to issuance of water meters)
$0.00
Irrigation/Fire Meter Deposit Fee:
ot~ ,-t. 10 Meter{s) (~ $30 00 ea
(100% ~lue prior to ~ssuance of water meters)
$300.00
Wa~llewater lmpac~ Ft.e:
': :3titl i;)omestic Meters FSU's;
0 @ $450.00 ea
$0.00
Wa~,l~ewater Tap lD*p(ction Fee:
:otai ;~: O Connections @ $50 00 ea
(100% dt~e prior to ~ssuance of building permit)
$0.00
Page 1
DEVEI.OPMENT FEE TABLE
Project: Coppcll Greens, Phase 1 (Change in irrigation meter s~.es & ndfl(ffonaI irrigation me
Date: 5/5/99
- TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
$14,400.00 $14,400.00 !
e prior to Council Approval)
on Fee $350.00
e at Issuance of Water Meter)
)omestic) SO.00
e at Issuance of Water Meter)
rrigatioWFireline) $1,231.57
e at Issuance of Water Meter)
;it (Domestic) $O.00
e at Issuance of Water Meter)
vleter Deposit $300~00
e at Issuance of Water Meter)
Fee ' '= $0.00 ~O.00
e prior to Council Approval)
;pection Fee $O.00
e at Issuance of Building Permit)
tion Fee $0.00
e at Issuance of Building ?errmt)
$0.00 $0.00
¢ prior to Couflcil Approval)
~'e $0.00 $0.00
e prim to Council Approval)
Information not Available
.e pr__io.r_.t0 Acceptance of Project
Information not AYailabl¢
e prlor_to~A?ceptance of Project
:don Fee :Information not Available
L
$16,281.57
r DUE PRIOR TO COUNCIL APPROVAL $14,400.00
Water [mpac?
( 100 ~ due
Water Tap b~spection
( lO0 ~ due
Water Mcte~ tke (
( t (:it 5/, due
Water Metel Fee 1
(1¢,:) ~; due
Water Meter D, posit
(1£0~ due
Irrigation/Fit el
(lC, O ~ due
Wastewater l~lpact
CF.'3 % due
Wastewater 7al' In:;[
(1009; due
Utilit? Final hi.,,I
I IfOE clue
Park Fee
(lC)~i ClUe
Roadway lmpa t Fee
(lC0~ clue
Street Light Fee
(IL,)~ due
Street Sign
( 1()% clue
Construcdor In!:.[
FOTAL
F~OTAL AMO~INT
COPPELL GREENS
1604
038245