Coppell Greens 2-CS 990805 COPPELL,
TEXAS 75019
Box 478
CoppeiL Texas 75019
972-462-0022
August 5, 1999
William A. Anderson, P.E.
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Drive Suite 200
Plano, TX 75093
Coppell Greens Phase Two
Fee Assessment Letter
Park Development Zone: Zone 1
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $185,715.00 and forward
to the Finance Department along with a copy of the Fee Assessment table. This amount is
a portion of the assessed fees that need to be paid prior to Council approval. Please refer
to the attached table for additional fees. Also provide a copy of the Engineer's estimate or
contract to our office so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees and insure a successful beginning of this project. We
look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
~A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Coppell Greens Phase Two
Date: 08/05/1999
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
couNCIL
APPROVAL
Water Impact Fee $51,750.00 $51,750.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $5,200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $2,618.34
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $327.71
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $3,570.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $45,900.00 $45,900.00
(100 % due prior to Council Approval)
Wastewater Tap Inspection Fee $5,100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $5,100.00
(100 % due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval) ~a~o~a Park/Coppell Greens I)evel. Agr~t
Roadway Impact Fee $88,065.00 $88,065.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100 % due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
rOTAL $207,691.05
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $185,715.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell Greens Phase Two
DATE: 08/05/1999
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
102 - 5/8 inch X 3/4 inch = 102 ESU's
1 - 1 1/2 inch = 5 ESU's
1 - 2 inch = 8 ESU's
0 = 0 ESU's
Total #: 115 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 104 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 102 Domestic Meter(s) @ $25.67
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee: This Information Provided by Developer
Total #: 1 Irrigation Meter(s) @ $135.66
Total #: 1 Additional Irrigation Meter(s) @ $192.05
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 102 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
102
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 102 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 102 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$51,750.00
$5,200.00
$2,618.34
$135.66
$192.05
$0.00
$3,570.00
$60.00
$45,900.00
$5,100.00
$5,100.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
103 Single-family @ $1,285.00 per lot
0 Multi-family @ $1,285.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Zone 1
$o.oo
$o.oo
See Magnolia Park/
Coppell Greens Devel.
Agreement
$88,065.00
Information riot Available
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Coppell Greens Phase Two
08/05/1999
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Residential
Land Use ** Single-Family Detached
No. Lots/Units 103
Development Units ** 103.00
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $88,065.00
* (Figure 2 - Roadway Impact Fee StUdy)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)