Loading...
Coppell Greens 2-CS 990805 COPPELL, TEXAS 75019 Box 478 CoppeiL Texas 75019 972-462-0022 August 5, 1999 William A. Anderson, P.E. Dowdey, Anderson & Associates, Inc. 5225 Village Creek Drive Suite 200 Plano, TX 75093 Coppell Greens Phase Two Fee Assessment Letter Park Development Zone: Zone 1 Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $185,715.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Coppell Greens Phase Two Date: 08/05/1999 TOTAL AMOUNT DUE FEES DUE PRIOR TO couNCIL APPROVAL Water Impact Fee $51,750.00 $51,750.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $5,200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,618.34 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $327.71 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $3,570.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $45,900.00 $45,900.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $5,100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $5,100.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) ~a~o~a Park/Coppell Greens I)evel. Agr~t Roadway Impact Fee $88,065.00 $88,065.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100 % due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project II Construction Inspection Fee Information not Available rOTAL $207,691.05 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $185,715.00 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Greens Phase Two DATE: 08/05/1999 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 102 - 5/8 inch X 3/4 inch = 102 ESU's 1 - 1 1/2 inch = 5 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's Total #: 115 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 104 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 102 Domestic Meter(s) @ $25.67 (Single family due prior to issuance of building permit) (Ail other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: This Information Provided by Developer Total #: 1 Irrigation Meter(s) @ $135.66 Total #: 1 Additional Irrigation Meter(s) @ $192.05 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 102 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 102 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 102 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 102 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $51,750.00 $5,200.00 $2,618.34 $135.66 $192.05 $0.00 $3,570.00 $60.00 $45,900.00 $5,100.00 $5,100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 103 Single-family @ $1,285.00 per lot 0 Multi-family @ $1,285.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Zone 1 $o.oo $o.oo See Magnolia Park/ Coppell Greens Devel. Agreement $88,065.00 Information riot Available Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Coppell Greens Phase Two 08/05/1999 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Single-Family Detached No. Lots/Units 103 Development Units ** 103.00 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $88,065.00 * (Figure 2 - Roadway Impact Fee StUdy) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)