Coppell Health-CS 890710COPPELL PUBLIC WORKS MEMORANDUM July 10, TO: FROM: RE: 1989 Russell Doyle, City Engineer Steve Goram, Director of Public Wo Metrocrest Hospital Authority Lake greement The review of the above reference has been performed. The gest of following is recommended to be inserted in the Agreement in order to ensure the City's long term interest: (1) At today's prices $10,000 can cover the cost of but there should be a clause inserted to cover factors if well isn't constructed until 1992. construction inflationary (2) What happens if the lake level can be maintained at the required level through 1992, but can't thereafter because of drought conditions, conservation measures, etc. I suggest the "Required Lake Level" be taken out of the agreement. If either yourself or Larry has any questions, let me know. SGG/bb cc: Alan Ratliff, City Manager Larry Jackson, City Attorney Howard Pafford, Water Utilities Superintendent