Loading...
Coppell CC 1B1-WO010612PhoneNumbec.(l~l) ~ (WK): ~/7- 3/ ~/~- ..~/9'-.~ Check for: Accuracy test: Meter Leak: Initial meter relocation inspections Check water pressure: Re-read 2. Rena~ 3. Maintenance Backflow Insp. Bkflow Cert. Date Re-Cert. Date A. Main Line A. Pump A. Line Locate B. Valves B. Water Tower B. Line Locate C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavat/on E. Safe~y 5. Reason for failure: A. Electrolysis B. New ConsUuction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: l)~ ~J~ ~ ~ ._~ (~_ ~: ~C) 7. If Meter/Service Leak: Claasify: - City: A. Water Loss (ese/mate): GPM __ B. Was Water Metered: Yes C. Was Custemer Notified: Verbally 8. If Meter Change Out: A. Old Meter # Reading B. New Meter # Reading C. Old Meter Size/Type:, E. Type of work performed or findings: Fire plug flushing Total Gallons No Doorknocker - Vehicle/Equipment Used Unit # Miles Hfs Equipment D New Meter Size/Type. 9. If malnllne or deep service repair, describe type of pipe or sex. ce line and condition: 10. Man-hours: Crew Members. 11. List Materials Used: 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature ~SI~ED SECON0 NA~R~ ~R~LEO ~ FORM 74620