Loading...
PA0001-CS010518 MEMORANDUM FROM TIlE DEPARTMENT OF PUBLIC WORKS To: Date: RE: Larry Davis, Construction Inspector Engineering Danny Hightower, Utilities Division Public Works May 18, 2001 Follow-up Walk-thru MacArthur Park 1. All O.K. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: larry Davis, Construction Inspector ~n~neering Danny Hightower, Utilities Division Public Works March 29, 2001 Walk-thru MacArthur Park 3/28/01 Manhole lower-dirt around manhole on northwest corner. Place marking Oll curb for all manholes in red (MH). Seal manholes per Larry Davis-2 new manholes. Bolt down 3 manholes with bolts. Mark valve on curb in blue and paint lid blue. Place plugs in DC 2" dom. Mark dom. On 2" meter can & curb in blue. Mark IRR on three 2" meter cans and on curb on blue. Two meter boxes covered-raise to ground level and clean inside meter ean~ to lower fittings. 0.~One manhole in field paint lid red. Note: Call 972-304-3545, D~nny Hightower, for follow up walk-thru. CI'I'Y OF COPPELL PUBLIC WORldS DEPARTMENT o. ~.~t-~ua o. tt~nn~ o hnmlnt & W:s~'a~::~nndt Yes C Wu C~m:~.~f,,e. ed: '4'erb~y MESSAGE CONF I RMAT I ON 05×18×01 10:44 IDzClT¥ OF COPPELL DATE 85/18 S~R-TIME DISTANT STATION ID 08'20" CITY OF COPPELL MODE PAGES RESULT CALLING 01 OK 0000