Loading...
ST9302-LR001012 (3)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: CITY OF COPPELL COPPELL, TEXAS PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS DATE: 10/12/00 OUR REPORT NO: 98881-155 TECHNICIAN: O.A. WEATHER: PARTLY CLOUDY TEMPERATURE RANGE:65 TO 75 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: SANDY LAKE ROAD EAST BOUND AT STATION #84+00 WHILE ON SITE THE TECHNICIAN PERFORMED 3 FIELD GRADATION TESTS ON LIME STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. JOE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: NONE Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting ..... [ ]~ r'T I' ALPHA TESTINg, INC. 2209 Wisconsin St., Suite I00 Dollas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 MECHANICAL STABILIZATION / MODIFICATION FINAL MIX TESTED FOR: PROJECT: CITY OF COPPELL COPPELL, TEXAS SANDY LAKE ROAD PROJECT NO. ST 93-02 COPPELL, TEXAS DATE: 10112/00 OUR REPORT NO: 98881-155A AREA OF WORK: SANDY LAKE ROAD EAST BOUND DATE CEMENT [ ] LIME IX I INITIALLY APPLIED 10112/00 DATE OF FINAL MIXING: 10/12/00 SAMPLE LOCATIONS: 1. SANDY LAKE ROAD E. BOUND AT STATION ~t-85+50 2. SANDY LAKE ROAD E. BOUND AT STATION #80+00 3. SANDY LAKE ROAD E. BOUND AT STATION #77+00 % PASSING % PASSIN~ 1 314" SIEVE ~ 100% 69% 100% 78% 100% 70% REMARKS: CC: NONE ~notnchnict~l t::nninnntfn~ 17 C. nnntnJction Mnterinln Te.ntino 17 Fnvironm~nfnl I::noinnerfnn 17 C..onn,lfino r"rTM T I! ~ ~ .... Y ~ ·