Loading...
Corners Coppell-CS 860826Lichliter/Jameson & Associates, Inc. August 26, 1986 Mr. Ed Powell, City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Corners of Coppell Dear Ed: Since our discussion with you early last week, we have been seeking the additional data that you requested to support the pavement design pro- posed for the Corners of Coppell. We have now received letters from Maxim Engineers, Inc., and from ATEC Associates, Inc., both of which confirm the adequacy of the 4-inch pavement thickness for the "light traffic parking areas". Maxim Engineering, as you will recall, provided the original geotechni- cal information on the project site and the recommended pavement design. They have provided additional technical design criteria and confirmed the adequacy of the recommended 4-inch pavement thickness. ATEC Asso- ciates, as you may be aware, provided the basis for the placement of the select fill material on the site, performed the field density testing as the material was being placed, and have now performed a pavement design evaluation. Copies of the letter dated July 24, 1986, relating to the 12-inches of select file material and density test reports prepared as the material was being placed on the site, were furnished by Ginn, Inc. You will note that the ATEC letter addresses the 12-inches of select subgrade material, the 18-inch spacing of reinforcing steel, and 4,000 psi concrete design in concluding that the 4-inch pavement thickness is indeed adequate. We trust that you will find this additional data to be sufficient basis for your confirmation of earlier approval of the project design and re- lease of the contractor to proceed with the construction now in prog- ress. Thank you for your consideration and cooperation in resolving this ques- tion. Page Two Mr. Ed Powell August 26, 1986 Very truly yours, Billy J. Thompson, P.E. Vice President BJT/ccw cc: Mr. Jim Anderson, Southwest Properties Mr. Steve Sutherland, Woodcreek Construction Mr. Gabe Farve, Ginn, Inc. Mr. Steve Hundley, SCH Architects Mr. Tim Lackey, L/JA Enclosure File: 677-0100-07 Lichliter/Jameson & Associates, Inc.