Corners Coppell-CS 850613ae
Be
Date: 6-13-85
Rev. No: 0
DEVELOPMENT IMPACT ANALYSIS
Corners of Coppell
General
1. Development Name and size: Corners of Coppell 11.61
2. Owner: Beeson/Stone/Righly Joint Venture
3. Engineer: Lichliter-Jameson
4. Current zoning: PD - Retail
5. Current status of development: Preliminary Plat
6. Location: SE corner Sandy Lake/MacArthur
7. Proposed density: 129,182 s.f. - 27% coverage
8. Annexation or land study required: None
9. Issues resolved: None
10. Issues to be resolved: Landscaping Sandy Lake Road
11. Dedications required: None
acres
Impact
1. Traffic:
a. Off-site collector streets: None
b. Off-site arterial streets: Sandy Lake & MacArthur
2. Sewer:
a. Proposed mains: 8"
b. Proposed connections to existing mains: 8" main
3. Water: 16" main in Sandy Lake Road
4. Drainage or Flow: to existing drainage ditch
5. Schools: Not affected
a. Primary school:
b. Middle school:
in MacArthur
C. Approvals and Fees
me
Fees:
Fees Required
Item (when required]
Preliminary plat $ 104
Site plan 100
Paid to dat~
Assessments and Pro Rata Charges: to be determined
Item:
Summary:
ae
Item:
Summary:
Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer:
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer=
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period:
6-13-85