Loading...
Corners Coppell-CS 850613ae Be Date: 6-13-85 Rev. No: 0 DEVELOPMENT IMPACT ANALYSIS Corners of Coppell General 1. Development Name and size: Corners of Coppell 11.61 2. Owner: Beeson/Stone/Righly Joint Venture 3. Engineer: Lichliter-Jameson 4. Current zoning: PD - Retail 5. Current status of development: Preliminary Plat 6. Location: SE corner Sandy Lake/MacArthur 7. Proposed density: 129,182 s.f. - 27% coverage 8. Annexation or land study required: None 9. Issues resolved: None 10. Issues to be resolved: Landscaping Sandy Lake Road 11. Dedications required: None acres Impact 1. Traffic: a. Off-site collector streets: None b. Off-site arterial streets: Sandy Lake & MacArthur 2. Sewer: a. Proposed mains: 8" b. Proposed connections to existing mains: 8" main 3. Water: 16" main in Sandy Lake Road 4. Drainage or Flow: to existing drainage ditch 5. Schools: Not affected a. Primary school: b. Middle school: in MacArthur C. Approvals and Fees me Fees: Fees Required Item (when required] Preliminary plat $ 104 Site plan 100 Paid to dat~ Assessments and Pro Rata Charges: to be determined Item: Summary: ae Item: Summary: Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer= Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: 6-13-85