Loading...
Corners Coppell-CS 850520APR - ~ 1986 GEOTE(~-IN I CAL INVESTIGATION FOR PROPOSED SANDY LAKE AT MacARTHUR SHOPPING CEN'I'~.~ COPPELL, TEXAS REPORT NO. B-5-0244 REPORT to BEESON-STONE-H IGHLY DALLAS, TEXAS by MAXIM ENGINEERS, INC. GEOTECHN ICAL/MATERI ALS TESTI NG/CONSULTANTS DALLAS, TEXAS l~ay 20, 1985 TABLE OF CONTENTS Introduction ............................................. 1 Site Location and Project Description ................... 2 Subsurface Soil Description ............................. 2 Analyses and Becommendations ........................... 3-7 APPENDIX Field and Laboratory Investigations ..................... General Construction Recommendations ................... Guidelines for Concrete Pavement .... o....... .......... ·. Joint Cross-Section Plan of Borings Log of Borings Symbols and Terms used on Boring Logs Unified Soft Classification System A-1 A-3 GEOTECH~]ICAL INVESTIGATION FOR PROPOSED SANDY LAKE AT MacARTHUR SI~.OPPING CENTEE COPPELL, TEXAS REPORT NO. ]~-5-0244 INTRODUCTION This report transmits the findings of the geotechnical investiga- tion performed at the referenced site. The purpose of this investigation was to define and evaluate the general subsurface conditions in the immediate vicinity of the proposed shopping center. Specifically, the study was planned to determine the following :. 1. Subsurface stratigraphy within the limits of explor- atory borings. 2o Classification, strength and compressibility char- acteristics of the foundation strata. mg pressures. 4. The Potential Vertical Rise (PVR) of critical soft strata. 5. Interior floor slab recommendations to accommodate anticipated Subgrade movements. 6. Construction requirements for the alteration of existing site conditions. 7. Construction requirements for the placement of necessary earth embankments or fills. 8. Generalized section recommendations for roadways and parking area pavements. 9. Other soft related problems which may be revealed by the investigation. 2 To accomplish the intended purposes, a three phase study program was conducted which included: a) a field investigation consisting of 16 exploration test borings with samples obtained at selected intervals; b) a laboratory testing program designed to evaluate the expansive and strength characteristics of the subsurface soils; and c) engineering analyses of the field and test data for foundation and pavement design recommendations. No additional analyses were requested or performed. A brief description of the various field and laboratory tests and their respective results is included in the Appendix of this report. II. SITE LOCATION A~D PBOJECT DESCRIPTION The site is located on the southeast corner of the intersection of Sandy Lake Road and MacArthur Boulevard in Coppell, Texas. The site surface is relatively fiat. The proposed project is currently planned as retail buildings and a Safeway Store with associated surface parking facilities. The structural loads were unknown at the time of this investigation, however, the loads are anticipated to be moderate with the floor system above surrounding grade. III. SUBSURFACE SOIL DESCRIPTION The surficial soils generally consisted of dark brown, yellowish brown and gray clays, sandy clays, clayey sands and sands. The clays exhibited Liquid Limits ranging from 21 to 63 and Plasticity Indices ranging from $ to 39° These materials 3 are considered moderately expansive with changes in the moisture regime. The primary gray shale was encountered at a depth ranging between 14.0 and 25.0 feet below the ground surface. Groundwater was encountered during the course of this investiga- tion in most of the test borings. The groundwater elevation can vary with atmospheric conditions and the drainage capabilities of the site and should be verified prior to construction that may be affected by its presence. IV. ANALYSES AND RECOMMENDATIONS The professional services which were performed, the findings obtained and the recommendations prepared were accomplished in accordance with currently accepted geotechnical engineering prin- ciples and practices. subsurface conditions encountered in the boreholes. was chosen in such a manner as undiscovered loading, size, The possibility always exists that the at the site may vary somewhat from those The number of borings and spacing to decrease the possibility of abnormalities, while considering the nature of and cost of the project. If there are any unusual conditions differing from those described herein, Maxim Engineers, Inc. should be notified to review the effects on the performance of the designed foundation. The recommendations given in this report are applicable only for the design of the previously 4 described shopping center to be constructed at this site; they should not be used for any other purpose. This firm is not responsible for the conclusions, opinions, or recommendations made by others based on this information. Support of Structural Loads The buflding~s structural loads should be supported by one of the following foundation systems: a. Auger excavated, cast-in-place, straight sided reinforced concrete piers founded at least three (3) feet into the primary gray shale layer encountered at 14.0 to 25.0 feet below the ground surface. These piers may be designed using an allowable end bearing pressure of 18.000 pounds per square foot, and a skin friction value of 2,200 pounds per square foot of shaft area in direct contact with the gray shale below thin,recommended mini?~m~_l~e_netration; or Auger excavated, cast-in-place underreamed reinforced concrete piers founded between 10 and 12 feet below the existing ground surface within the brown, yellowish brown and gray clay layers. These piers may be designed using an allowable end bearing pressure of 4,400 pounds per square foot. Underreamed piers should have a ball shaft 'diameter ratio ranging between 2 and 2.5 to 1. The pier shafts should contain enough steel reinforcement to resist tension forces of up to 1,500 pounds per square foot acting in a vertical direction that may be created by the swelling of the surficial overburden clays. Foundation piers, proportioned, designed and placed in accordance with the recommendations provided in this report will have a factor of safety in excess of 2.5 against shear type failure. Subsur- face water conditions indicate that the use of temporary casing will be required during the installation of some of the foundation piers. Floor Slabs The near surface soils encountered at this site exhibit plasticity indices ranging between 6 and 39 and should be considered as moderately active with changes in moisture regime. The amount of potential differential vertical move- ment that may occur for the subgrade materials at this site is estimated to range between 1.25 and 2.50 inches. Any slab-on- grade system placed on the existing softs when they are in a dessicated (dry) condition with no soft benefication, should be expected to sustain up to 2.5 inches of potential vertical differential movement. In order to reduce the effect of the vertical movement of the overburden softs, the placement of two (2.0) to two and one- half (2.5) feet of select fill placed above existing grade in accordance with specifications provided in the Appendix of this report, will reduce the potential vertical differential soil movement to 0.75 to 1.00 inch. Considerable more move- ment will occur in areas where surface ponding is allowed to occur during or after construction. Grade beams should be separated from the subgrade by a void of not less than six (6) inches. In order to be completely immune from future vertical move- ments due to the heaving of the subgrade at the surface, the slab would have to be structurally supported and physically separated from the subgrade by a void of not less than six (6) inches. Paving Recommendations Prior to beginning pavement construction, softs at the natural ground surface in the proposed parking area should be scari- fied and grubbed to a depth of at least six (6) inches. Organic materials and any vegetation should be removed from the site. The scarified areas along with areas requiring additional fill should then be recompacted to a minimum of 95 percent of the Standard Proctor Density~ as defined by ASTM D 698 at a moisture content within three (3) percent of the optimum moisture value. The following pavement sections are recommended for this project: 4.00 inches 6.00 inches Light Duty Parking Portland Cement Concrete* (15 foot joint spacing) Scarified and lqecompacted Subgrade *See Guidelines for Concrete Parking Areas in the Appendix of this report. Areas of Channelized Traffic 6.00 inches Portland Cement Concrete* (15 foot joint spacing) 6.00 inches Scarified and Recompacted Subgrade The light duty pavement is designed for 200 to 300 vehicles per day, five (5) to seven (7) of which may be heavy commercial trucks. The channelized heavy traffic pavement is designed to sustain 300 to 500 vehicles per day including eight (8) to ten (10) heavy commercial vehicles. *See Guidelines for Concrete Parking Areas in the Appendix of this report. FIELD AND LABORATORY INVESTIGATIONS PROPOSED SANDY LAKE AT MacARTHUR SHOPPING CENTER COPPELL, TEXAS · REPORT NO. B-5-0244 Field InvestiEatlon Soft conditions at the project site were determined by 16 inter- mittent sample borings which were advanced during May, 1985. The locations of these borings are shown on the sheet entitled "Plan Of' Borings" of this report, Descriptions of the various strata encountered in each of the borings and the depths at which samples were obtained are presented on the individual "Log of Borings'% _: ~Undis.turbed.._speckne_ns of coh?_?!ve s0fl_s were obt_,a~n.~e~_with thin- walled Shelby tube samplers (ASTM D 1587). The soil specimens were extruded from the tube in the field, logged, sealed and pack- aged to maintain "in situ" conditions. Disturbed samples of the hard cohesive materials, were obtained utilizing a two (2) inch O.D. split-spoon sampler in conjunction with the Standard Penetration Test (ASTM D 1586). This test employs a 140 pound hammer that drops a free fall vertical A-2 distance of 30 inches, driving the split-spoon sampler into the material. The number of blows required for 18 inches of penetra- tion is recorded and the value for the last 12 inches, or the penetration obtained from 100 blows, is reported as the Standard Penetration Value (N) at the appropriate depth on the attached "Log of Borings% II. Laboratory Soils Tests Laboratory soil tests were performed on samples recovered from the borings to verify visual classification and determine the perti- nent engineering properties of the soils encountered. Atterberg Limits, Moisture Content, Unit Dry Weight and Percent Passing a No. 200 U.S. Sieve tests were performed on representa- tive samples in order to classify them according to the Unified Soft Classification System. Unconfined Compressive Strength tests were performed on selected undisturbed soil samples to determine the ultimate unconfined compressive strength of the different subsurface strata encoun- tered. The results of all the laboratory and field tests are tabulated on the "Log of Borings" presented in the Appendix. GENERAL CONSTRUCTION RECOMMENDATIONS PROPOSED SANDY LAKE AT MacARTHUR SHOPPING CENTER COPPELL, TEXAS ' REPOlqT NO. B-5-0244 Site Preparation Prior to placing any fill material, all existing surface vegeta- tion should be removed. Ail exposed surfaces should then be scar- ified, watered as required and recompacted to a minimum of 95 per- cent of the maximum dry density as defined by ASTM D 698 (Standard Proctor Test) at a moisture content within three (3) percent of optimum moisture value. The site may then be filled to grade using a suitable fill material, free from deleterious matter. Fill materials should be placed in six (6) to eight (8) inch loose lifts at moisture contents within three (3) percent of the optimum ¥~k~,~nd~q_h lift r~mpacted to between 93 and 100 percent of the maximum dry density as defined in ASTM D 698. Each lift should be inspected and approved by a qualified engineering technician, supervised by a Geotechnical Engineer before another lift is added. II. Select Fill "Select Fiil" as referred to in the main body of the report should consist of clayey sands free of organic materials and having a Plasticity Index between four (4) and fifteen (15), and a Liquid Limit of 40 or less. Placement and compaction of the select fill should be performed in accordance with the above mentioned "Site Preparation" section. III. Surface Stabilization It should be noted that the near surface softs will lose strength with an increase in moisture content. Such materials, if wet, are subject to "pumping" when being compacted in areas such as parking lots, streets and under floor slabs. If required, pumping can often be counteracted with the addition of hydrated lime. Suffi- cient hydrated lime should be added to the in-place soft in order to reduce the Plasticity Index to less than 15. IV. Foundation System Normal construction procedures for this area of Texas should be employed in the installation of drilled, cast-in-place, under- reamed and straight shaft foundations. Concrete and reinforcing steel should be placed immediately after the excavation has been completed and inspected by a Soils Engineer to assure compliance with design assumptions and to verify: A) the bearing stratum; B) the minimum penetration; C) the removal of all smear zones and cuttings; and D) that groundwater seepage is correctly handled. In no event should an excavation be allowed to remain open for more than eight (8) hours. All concrete placed in excavations in excess of ten (10) feet in depth should be properly tremied to prevent separation of the aggregates. Based on borehole informa- tion, it appears that temporary casing will be required to avoid sloughing of the upper soils and seepage infiltration in the area of the proposed excavations. Secondary Design Considerations The following information has been of numerous problems dealing with assimilated after examination similar soft throughout the area. It is presented here for your convenience. If these features are incorporated in the overall design of the project, the performance of the structure will be improved. Ae Roof drainage should be collected by a system of gutters and downspouts and transmitted by a pipe to a storm drainage system or to a paved surface where the water can drain away without entering the soil. The sidewalks should not be structurally connected to the building. They should be sloped away from the building so that water will be drained away from the structure. Special consideration should be given to completion items out- side the building area such as stairs, walkways, signs, etc. They should be adequately designed to sustain the potential vertical movements mentioned in the main body of the report. D. Parking lots, A-6 streets and surface drainage should be sloped away from the buildings on all sides. Water should not be allowed to pond near the buildings after the slab has been placed o Backfill for utility lines should be carefully placed so that they will be stable. If the backfill is too dense or too dry, swelling may form a wound along the ditch line. If the back- fill is too loose or too wet, settlement may form a sink along the ditch line. Either case is undesirable since several inches of movement is possible and floor cracks are likely to result. The soils should be processed using the previously discussed compaction criteria. Where the utility lines pass through the parking lot, the top 6 inches should be compacted similarly to the remainder of the lot. Fo The floor slab placed at or below existing grades should be provided with a moisture barrier in order to prevent wet spots. A-? GUIDELINES FOR CONCRETE PAVEMENT PROPOSED SANDY LAKE AT MacARTHUE SHOPPING CENTER COPPt~LL. TEXAS REPORT NO. B-5-0244 CHARACTERISTICS OF CONCRETE: 1o An concrete should have a specified 28-day compressive strength of 3.000 psi. Concrete should be manufactured and delivered in accordance with ASTM C 94; Standard Specification for ready mixed concrete. 2. Four (4) to six (6) percent air should be entrained in the concrete o 3° The maximum coarse aggregate size should not be greater than one-fourth the slab depth. 4o Maximum slump should be four (4) inches + one (I) inch. II. SUBGEADE PBEPARATION: 1. Prior to beginning paving operations, all vegetation should be removed to a depth of at least six (6) inches. The exposed surface should then be scarified and recompacted. to a minimum of 95 percent of the maximum dry density as determined by ASTM D 698 (Standard Proctor Test) at a moisture content within three (3) percent of the optimum moisture value. In the event that additional fill is necessary to bring the parking area to grade, it should be placed in 6 to 8 inch loose lifts and compacted to a minimum of 95 percent of the maximum dry density as determined by ASTM D 698 (Standard Proctor Test) at a moisture content within three (3) percent of the optimum moisture value. The subgrade should be in a moist condition at the time con- crete is deposited thereon. Using coarse sand (sand cushion) as a leveling material is not recommended. Surface runoff water may be piped through the coarse material and adversely affect the underlying subgrade. IIio JOINTS: 1o R~ecommended joint ~pacings are~ provided in the "Pavement Recommendations'~ section of this report. w Control joints or contraction joints should be formed by one of the following methods: sawed, hand-formed or formed by premolded filler. Joint depth should be equal to 1/4 of the slab thickness. Hand-formed joints should have a maximum edge radius of I/4 inch. Sawing of joints should begin as soon as the concrete has hardened sufficiently to permit sawing with- out excessive ravelling. All joints should be completed before uncontrolled shrinkage cracking occurs. Joints should A-9 be continuous across the slab unless interrupted by full-depth premolded joint filler, and should extend completely through the curb. Joint openings wider than 1/4 inch should be cleaned and sealed before opening parking area to traffic. Expansion joints or isolation joints should fixed objects abutting or within the paved area. contain premolded joint filler for the full depth and should be sealed prior to opening to traffic. be used to isolate They should of the slab 4. Utilization of an integral curb is recommended. Ioolatic~ Joint \ E. xpansion Material ~JOZNT CBOSS-sECrz(~ Sawed Joint /Pre~r~lded Fill.r Joint · · Flush with Surface - use only w~ere ~heel loads will ~ the joint Stricture Note: All joints ~houl4 ~e cleaned and sealed prior to ope~ to traffic. Proposed Sandy ~ at ~carthur ~oppin~ ~nter ~ppeil, Texas ,. STRATUM DESCRI~ION it g~ ~ ~z - Z3 - 2] [00 ~9 25 24~ 5- -- 26 93 1,860 20- - 2~ 102 3,780 - 26.0~ (~) 23 101 37 17 20 2,320 26.0' 5-H-85I ~coun~e;ed a~ 25.0' Maxim Engineer. Log of Boring i~u.~.~_2 ~.~o~ see Pla~ Proposed Sand7 ~ke at M~rthur Shopping ~nter Coppellz Texas i ii~ li~ STRATUM DESCRIPTION -I 13 111 30 14 16 D~ BRO~ S~Y ~Y _ with yellowish bro~ seams -I ~0- ~ 24 99 3,250 '- 20- 20.0 ' (CL) - ~ ~i 21.0' Y~WISH BRO~ CMYEY S~D a _ 25- ~mp~tion ~pth Date Water Obviations 2[.0~ ~-[[-8~ ~coun~eTe~ a~ 20.0~ Log of Boring N~mb~_3 Loca~ See ~lan o£ Prelect ,mi,oosed S, mdv ~ke at H~Cnrthur Shoppinl Center Coppell, T~as ~ STRATUM DESCRIPTION - ~ g~ BgO~ S~ ~ ~~ 2.5' (CL) 12 11~ 2~ 14 10 ~ ~ G~ and ~S~ BRO~ S~ ~Y ~ 6.0~ (~) -I ~s- ~5.0' (~) _1~ ~ H: 2s ~5 ~0 2,~00 _ YELLOWISH BRO~ S~Y C~Y Z0- ~ 20.0' (CL) - ~:~:~::~:~ 21.0' YELLOWISH BRO~ S~ (SP) 19 21 25- 21.0' 5-10-85 Enconntered at 20.0'; stood at 6'-8" at completion. Maxim Englfteerl Log of Boring iN,~_4 Loc.tio~ See Plan of Borinss I- Proposed Sandy Lake at Macarthur Shopping Center Coppell, Texas I []nknoT,,m E · 3 ~ ~ c . :~ ~ ~ STRATUM DESCRIPTION . 5~ ~ ~ .~ ~ ~ ~.0' (sc~ ~o 5- ~ D~ G~Y ~Y  with calcareous n~dules 10{ 58 25 33 27 ~0- -I - 25 95 2,630 ~l~' ~ 16.0' (CH) 18 104 46 18 28 4,420 ~ YEL~SH BRO~ C~Y 20- ~ 20.0' (~)  YELLO~SH BRO~ S~D  2~.0~ (SP) 25- G~Y S~LE CONTI~ED ON NE~ PAGE Maxim Englneea Proposed Sandy Lake at ~car~hur Shovvin~ Center 'oppe~], T~ X 30.5' m I I 30.5' 5-10-85 Encountered at 20.0'; stood at 7'-3" a: completion. Log of Boring )"u"~ 5 I - See Plan of Borings Proposed Sandy Lake at Hacarthur ~hopping Center Coppell, -- 11 121 :~..:. D~ I~SH BR~ ~ S~ - 6.o' ~5- ~ 15.o' (CL) - ~ 16 11~ 33 15 18 ~750 ~ ~ ~o~ s~ ~.'.. w~h calcareou~ nodule8 20- ~ 20.0~ (eL) - 21.0~ YELLO~IS~ BRO~ S~ 25- I ~mp~lion ~h Date water O~tions 2[.0' 5-[0-85 ~ncounteced a~ 20.0~; sLood a~ 7'-8' a~ comp[e~on. Maxim Englneem bog of Boring i~_6 ~,io~ See P~an of Borings Pro )oscd Sandy Lake at Hacarthur Shoppin~ Center Coppellt Texas ~ ~ , Inta~ittent Sampling i~ STRATUM DESCRIPTION at* 35 [~ ~s ~i' ~ D~ BRO~ S~Y C~Y 5-~ 6.0' 10- ~ 10.0' - ~ 26 97 55 20 35 D~ BRO~ ~Y  D~ YELLOWISH B~0~q SA2qD7 C~.Y - 2~.0' (SP) ~ G~Y S~E Mgxim Engineer. of Boring l"""~_6 ~'~"~ coat See Plan of Borings Proposed Sandy L~ke at Hacarthur Shopping Center Coppell, Texas Intermittent Samplin~ Unkno~m STRATUM DESCRIPTION GEA¥ SHALE Completion Depth Date Water ObseWation$ 30,5' 5-]0-85 Eacount:ered at 20.0'; ~tood al: 7'-6" at: comp]et:ion. Log of Boring i~"~' I B-7 See Plan of Bo=in~s Proposed SAnd~ Lake at Hacarthur Shopping Center ~ppe11~ Texas ~ STRATUM DESCRIPTION 3 =~ ~ ].0~  15 119 ~ G~ and D~ Y~IS~ BRO~ ~ __ w~th caleareou~ nodule~ 6.0' (CL) ~ D~ G~Y C~Y 10~ 10.5' (c~) -- ~ D~K BROWN C~Y 15- 15.0' (C~) -I"~ 23 ~ 2,~s0 _ YELLOWISH BRO~ S~Y 20- 20.0' (CL) _ YELLOWISH BRG~ S~D 2..0' (SP) 25- CONTII~ED ON NEXT PAGE I M.xlm Englneer~ i I~ob of Boring I""m"~-~ ~o.~1"~'"°" Se~ ~-_,, o~ ~o~inss Proposed Sandy Lake at ~car~hur Shopping Center Coppell. Texas i l J! STRATUM DESCRIPTION , i~ i ~ ~  G~Y S~E ~ 30.5' 30.5' 5-10-85 . Encountered at 20.G'; stood at 8'-tJ' ar completion. - See Plan of Borings Proposed Sandy Lake at Macarthur Shopping Center Coppell, Texas Type ~ STRATUM DESCRIPTION ~ ~ BRO~ ~Y 2.0' with calcareous nodules D~ BRO~ S~Y CMY G~Y and YELLOWISH BRO~  21 LO7 2,760 S~Y ~Y  G~Y and YELLOWISH BRO~ 20- ~ C~YEY S~ ~ [ 20.5' (sc) ~5}~ 21.0' YELLO~SH BRO~ S~ (SP) 22 48 25- 21.0' 5-9-85 Encountered at 19.0': stood at 10.0' at commlet~on. Log of Boring I B-9 See Plan of Borings Proposed Sandy Lake at Macarthur Shopping Center Coppell, Texas ~ - ~ ~ ~ ~ uE~ ~ I~{~ STRATUM DESCRIPTION o . .{,~' 1.0' (FILL) (CL) 18 104 42 21 21  BRO~ and D~K Y~LOWISH BRO~ S~Y ~Y 6.0' (CL) D~ BRO~ C~Y 24 I 47 18 29 13.0' (CL)  G~Y and YELLOWISH BRO~ CLAY 19.0' <CL> G~Y and YELLOWISH BRO~ S~Y 16 110 { 3,960 CLAY with calcareous nodules 26.0' (CL) 20 109 1,480 26.0~ 5-9-85 EncounLe~e~ a~ Maxim Englneer~ · Log of Boring ~u< " ' I ---10 See Plan of Borings Proposed Sandy Lake at Nacarthur Shopping Center Coppe11, Texas Intermittent Sampling ~ [~[~ STRATUM DESCRIPTION ~ D~ S~O~ S~ C[A~ ~ ~ ~ ].0' (~[~) (CL) ~"~'~ D~ C~Y S~ ~ 20 ~0[ 33 ~6 ~7 2,460 5.0' (~) 16 108 31 1~ 17 G~Y and YELLO~IS~ BRO~ S~Y CLAY 10 '~' 18.0' (CL) G~Y and YELLOWISH BRO~ S~LEY 20.0~ (CL) 21.0' G~Y S~ (SP) 23 96 1,050 21.0' 5-9-85 Encountered at 20.0~ B-Il See Plan of ~orings Pro )osed Sandy Lake at Macarthur Shoppin~ Center Coppell~ Texas ~i Intermittent Samolins il Il! STRATUM DESCRIPTION  D~ BRO~ S~Y C~Y 14 I10 33 17 16 5,970 3.0' (CL) D~ YELLOWISH BRO~ ~AY with calcareous nodules 7.0' (~) - :;':~7~ D~ ~LLO~SH BRO~ S~ ~>::::: with gravel ~?:.>:.: 10.5' (SP) 23 63 24 39 2~ ~5.5' _ G~Y S~E 20- - i1' ~1.0' I ~mpletio~ ~th Date Water Ob~rvations 21.0' 5-9-85 Encountered at 10.5'; stood at ]0.0' at completion. '/.o.g of Boring B-Il See Plan of Borings LocatiOn1 Proposed Sand7 Lake at l~acarthur Shoppin~ Center Coppell~ Texas .~ TyI~ Intermittent Sampling !i ~.~ STRATUM DESCRIPTION ~ ..==. ~ D~ BRO~ S~Y C~Y 14 118 26 14 12 5- 5.0* ~I ~ D~ G~Y and YELLOWISH BRO~ -I C~ S~ 16 116 ~ 19.o~ (sc) ~.-I 21.0' G~Y__S~Y ~AY (CL} 17 114 3,540 25- ~ I Completion ~pth Date Wa~r Ob~rvations 21.0' 5--13--85 Encountered at 15.0'; stood at 7'-6' at completion. Maxim Englrteerl 'l__Oll of Boring I fi-lqI See Plan of Borinl~s Proposed Sandy Lake at Macarthur Shoppint Center Coppell, Texas lln~n~ i! {I[ STRATUM DESCRIPTION  D~ G~Y CLAY ~ G~Y and Y~LO~IS~ BRO~ 23.0' (CL) CO~TI~ED ON NEXT P~GE Maxim Engineers Log of Boring ,u~, B-13 con See Plan of Borings Proposed Sandy Lake at Macarthur Shopping Center Coppell, Texas ~ Intermittent Sam~lin~ · ~ -- ~ ~ §.~ i~ STRATUM DESCRIPTION GRAY SHALE Completion Depth Date Water Observstion$ 30.0' 5-11-85 Encountered at 15.0'; stood at 10.0' at completion. ~roposecl Sand7 'lake at Macarthur Shopping Center Coppell, Texas Intermittent Sampling __ BROI~I SA_,~ 5 11 -- with gravel ?'..'::.;:::{~ 2.5 ' (,~p~  DARK BROI~I SANDY C'l~¥ 10 I~'..~'~ GRAY and YELLOWISIt BROWN SARDY CLAY 10- 10.0' (CL) - BROWN and GRAY SHALEY CLAY 14.0' (CH) GRAY SHALE 5O 20 ~ 19.5' 25-- 19.5' 5-13-85 None encountered Maxim Englneer~ I B-15 See Plafi of Broinss Proposed Sandy I~ke at Macarthur Shoppin~ Center Coppell, Texas ~ Continuous Samplin~ ~ ~ ! ~i -- D~ BRO~ ~Y 20 103 43 22 21 3,710 -- with calcareous nodules 5- 5.0' (~) 20- 25- I I Completion ~pth Date Wa~r Ob~rvations Maxim Englrieer~ .'~ of Boring ~-~6 See Plan ofl~orin~s Pro)osed Sandy Lake at Hacarthur Shoppin~ Center Coppell, Texas .Continuous Samvling ~ ~ = ~ ~ c & ~ ~ STRATUM DESCRIPTION ~ ~= ~ " ~ ~ ~5 ~ ~ [~ H5 35 ]6 ~9 ]0~000 - ~ D~ SEO~ C~ 5- 5.0' (~) 10- 15- 20- 25- Completion ~pth 5- ] [--sD~te Water Ob~rvations ~ I ~ 5,0~ ~o~e encountered Maxim Engln~