Loading...
Coppell Church-CS 901016COPP~T.T. POBLIC ~OltES October 16, 1990 File/Church of Christ - Samuel Boulevard Public Works Staff Coppell Church of Christ Development Fees Water Im ct Fee ($660/ESU) i 1/2" 1 1/2" Domestic Meter = 5 ESU's Irrigation Meter = 5 ESU's Total ESU's = 10 10 ESU'B @ $6.60 each $6,600.00 Wastewater ImDact Fee 1/2" Domestic Meter Total ESU's ESU's @ $422 each ($422/ESU) 5 ESU's 5 $2,110.00 Water TaD Fee ~Insoection) 2 Taps @ $100 each - Inspection Fee - (2% X Estimated Contract Cost) - Street and Signs $200.00 To be determined prior to pre-construction meeting $292.60 Street Lisht Assessment The following assessment is being made in accordance with the City of Coppell. Subdivision Ordinance Appendix A Chapter VI, D. The following figures were supplied by T.P. & L. for estimating this assessment. $292.60 per light for'every 200 feet of roadway. You ar~ being assessed for [~Z) ft. of roadway, which totals to{ light~. × _L lights *Before lights are,installed contact Public Works - Steve Goram, Director of Public Works or Per Birdsall, to have lighting plan approved. Street Foreman