Coppell Church-CS 901016COPP~T.T. POBLIC ~OltES
October 16, 1990
File/Church of Christ - Samuel Boulevard
Public Works Staff
Coppell Church of Christ Development Fees
Water Im ct Fee
($660/ESU)
i 1/2"
1 1/2"
Domestic Meter = 5 ESU's
Irrigation Meter = 5 ESU's
Total ESU's = 10
10 ESU'B @ $6.60 each
$6,600.00
Wastewater ImDact Fee
1/2" Domestic Meter
Total ESU's
ESU's @ $422 each
($422/ESU)
5 ESU's
5
$2,110.00
Water TaD Fee ~Insoection)
2 Taps @ $100 each
- Inspection Fee -
(2% X Estimated Contract Cost)
- Street and Signs
$200.00
To be determined prior to
pre-construction meeting
$292.60
Street Lisht Assessment
The following assessment is being made in accordance with the
City of Coppell. Subdivision Ordinance Appendix A Chapter VI,
D. The following figures were supplied by T.P. & L. for
estimating this assessment.
$292.60 per light for'every 200 feet of roadway.
You ar~ being assessed for [~Z) ft. of roadway, which totals
to{ light~.
× _L lights
*Before lights are,installed contact Public Works -
Steve Goram, Director of Public Works or Per Birdsall,
to have lighting plan approved.
Street Foreman