FIELD REPORT
Proiect No. 19:4236-A
Repod No. 10
Day & Date Tuesday 10/18/2005
Weather 70°/Clear
On-Site Time 0.75
Lab Time 0.25
Travel Time* 1.00
Total 2.00
Re Obs.'l]me 0.00
Time of Arrivat Departure
07:00A 07:45A
* Travel time and mileage will be billed in accordance with the contract.
(field rant data, loc. alone, elevations & depths am eetlmafes) & Individuals Cc.~-': c~,..*.
Soil Compaction Tests:
The undersigned arrived on site, as requested, to observe the placement and compaction of soils
for paving, NE and NW comers. Please refer to the attached compaction report.
Utilizing the Nuclear Method (ASTM D-2922) to verify the compaction of soils; test results
indicated that the compacted material, at the areas and depths tested, met or exceeded the
project requirements of 95% of the maximum dry density as obtained in our laboratory using the
Standard Proctor Method (ASTM D-698).
The soils observed on this date appeared to be placed in compliance with project drawings and
specifications with regard to lift thickness and moisture content.
By Marvin Hanks, -- Field Technician