Loading...
Denton Tap 1A-LR051018ECS - Texas LLP 4950 Keller Sprlnga Roed, Sult~ 480 Addlean, TX 7~001 (972) Sfi2~222 (FAX) 392-0102 Project Wachovia - Coppell Locatic~ Coppeli, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Tdp Charges* Chargeable Items Toils/Parking* Mileage* Nuclear Gauge Rental 40 FIELD REPORT Proiect No. 19:4236-A Repod No. 10 Day & Date Tuesday 10/18/2005 Weather 70°/Clear On-Site Time 0.75 Lab Time 0.25 Travel Time* 1.00 Total 2.00 Re Obs.'l]me 0.00 Time of Arrivat Departure 07:00A 07:45A * Travel time and mileage will be billed in accordance with the contract. (field rant data, loc. alone, elevations & depths am eetlmafes) & Individuals Cc.~-': c~,..*. Soil Compaction Tests: The undersigned arrived on site, as requested, to observe the placement and compaction of soils for paving, NE and NW comers. Please refer to the attached compaction report. Utilizing the Nuclear Method (ASTM D-2922) to verify the compaction of soils; test results indicated that the compacted material, at the areas and depths tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in compliance with project drawings and specifications with regard to lift thickness and moisture content. By Marvin Hanks, -- Field Technician 1800 70671 5 0