PA9901-CS011002 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To--
l~rom:
Date:
RE:
! arry Davis, Construction Inspector Engineering
larry Morton, Streets Division Public Works
October 2, 2001
Follow-up Walk-thru Wagon Wheel Park Phase H
PAVING
1. Rout and seal all random cracks parking lot and sidewalk.
2. Replace broken curb.
3. Smooth out gouges in curb.
4. Repair broken comers of sidewalk.
5. Place rock rip-rap around all RCP's going into creek.
DRAINAGE
1. Remove forms from inlet boxes.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
10/82×01 10:45
ID--CITY DF CDPPELL
DATE
10x02
S,R-TIME DISTANT STATION ID
00'25" 9?2 384 9041
MODE PAGES RESULT
CALLING 01 OK 0000
From: Rhonda Bmthem
To: walk-thru
Date: Fri, Sep 28, 2001 9:21 AM
Subject: Wagon Wheel Pad(, Ph. 2
Per Lan~ Davis, a final walk-thru for streets, utilities and drainage on the referenced project has been
scheduled for Tuesday, October 2, 2001 at 9:00 a.m.