Loading...
Creekview II L2-PT 940404Bore/Excavation in Public Right-Of-Way Permit City of Coppell - Public Works Department Permit Issued To: Name: Address: Phone: Emergency Phone: Representing: Type of Work/General Description: Have Ail City and/or Franchise utilities Been Contacted and Existing utilities Located: X YES NO will It Be Necessary to Excavate Street, Alley or Sidewalk pavement? YES (attach permit) NO Representative(s) of the Franchise/Contractor must adhere to all o~struction s~andards approved by the City of Coppell, which C includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street reported to the Police, Fire, and Public Works to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) or alley must be Depa_~tments prior PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franchise/Contractor Representative Date Fr/anchise iispec~o~r C£ty Inspector Date App!ican: shall indemnify and forever hold harmless against each and eve~/ claim, demand or cause of ac:ion =ha= may be made or come against it by reason of or if any way arising out of the closure, blockinq, excavating, cut=lng, tunneling, or other work by the applican: under permit from ~he City, if such permi~ is granted. PE~¼IT · PI[B Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NOW ETBORESALLOW~u!