Sherrill L2A-CS021119November 19, 2002
Dale Ridinger
Allen & Ridinger Consulting, Inc.
109 W. Main Street
Lewisville TX 75057
RE: Coppell Pediatric Associates
Fee Assessment Letter
Dear Mr. Ridinger:
Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the mount of $1,304.02 and forward the check to the
Engineering Department along with a copy of the Fee Assessment Table. This mount is the portion of
the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's
estimate or contract to our office so the 2% & 4% construction inspection fee can be verified.
Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer
Impact Fees until the issuance of a Building Permit.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check to the Public Works Department in the Coppell Municipal Service Center, 816 S. Coppell
Road. Meters will be ordered when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please feel free to contact me at
your convenience.
Sincerely,
Teresa Turner, E.I.T.
Graduate Engineer
CC:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Admin. Secretary, Building Inspections
Qlenn Hollowell, Assistant Director of Public Works
Lireg Jones, CluefBulld]ng Official -
Project:
Date:
DEVELOPMENT FEE TABLE
Coppell Pediatric Associates
11/19/02
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $62.25
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $62.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $700.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $1,304.02 ' $1,304.02
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) II
TOTAL $3,788.52
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,304.02
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Coppell Pediatric Associates
11/19/02
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
FirelineMeter(s):
i * 1 inch = 2.5 ESU's
i * 1 inch = 2.5 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #:
2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #:
i Domestic Meter(s) @ $62.25
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigatiou/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$62.25
$0.00
$0.00
Domestic Water Meter Deposit Fee:
Total #: I Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters EaU's: 2.5
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: i Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
@ $280.00 ea.
$1,400.00
$100.00
$62.25
$62.25
$0.00
$0.00
$30.00
$3O.OO
$700.00
$50.00
$5O.O0
$0.00
$0.00
Park Fee (For Residential Developments Only): * Preliminary plat approved:
Single-family @ $0.00 per lot
Multi-family @ $0,00 per unit
(50% paid prior to Council approval of final plat)
Page 1
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact lee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$1,304.02
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way,
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2