Sherrill L2A-CS021119 (2)PROJECT NAME:
ENGINEER:
ORIGINATION DATE:
DEVELOPMENT FEES
Coppell Pediatrics Assoc.(Sherril Acres, Lot 2A)
Allen & Ridinger
11/19/2002
SENT
11/19/2002
11/19/2002
11/19/2002
11/19/2002
11/19/2002
11/19/2002
11/19/2002
11/19/2002
11/19/2002
11/19/2002
ASSESSMENT
Water Impact Fee
Wastewater Impact Fee
Park Fee
Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
ASSESSED FEE AMOUNT PAID DATE
$1,400.00 $1,400.00 mb 1/21/2003
$700.00 $700.00 mb 1/21/2003
n/a
$1,304.02 $1,304.02 rb 1/21/2003
to be calculated
$100.00 $100.00 di 2/17/2003
$50.00 $50.00 di 2/17/2003
$62.25 $62.25 di 2/17/2003
$62.25 $62.25 di 2/17/2003
$30.00 $30.00 di 2/17/2003
$30.00 $30.00 di 2/17/2003
$50.00 $50.00 di 2/17/2003
[]Subtotal to En~.
TOTALS
$1,304.02 $1,304.02 $0.00
Total Fees Fees Paid Amount Owed
$3,788.52 $3,788.52 $0.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.