Creekview P2 L1R BA-CS020719 DEVtOPMENT FEES~'
PROJECT NAME: Creekvlew II, Lot lA BIk A (Salon on the Creek)
ENGINEER: Spiars Engineering
ORIGINAT ON DATE: 7/19/02
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
7/19/02 t Water Impact Fee $1,400.00 ~
7/19/02 Wastewater Impact Fee $700.00
Street Sign
Street Light
9/19/02 Construction Inspection $1,391.00 $1,391.00 pc 9/23/02
7/19/02 Roadway Impact-Zone $5,937.12 $5,937.12 pc 8/8/02
Street Cut Permit
Overtime Inspection
7/19/02 Water Tap Inspection $100.00 $100.00
7/19/02 Wastewater Tap Inspection $50.00 $50.00
7/19/02 Water Meter (Domestic) $62.25 $62.25
7/19/02 Water Meter (Fire/Irrig) $62.25 $62.25
7/19/02 Meter Deposit (Domestic) $30.00 $30.00
7/19/02 Meter Deposit (Fire/Irrig) $30.00 $30.00
7/19/02 Utility Final Inspection $50.00 $50.00
Subtotal to Eng. $7,328.12 $7,328.12 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $9,812.62 $7,712.62 $2,100.00
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.