Loading...
Creekview P2 L1R BA-CS020719 DEVtOPMENT FEES~' PROJECT NAME: Creekvlew II, Lot lA BIk A (Salon on the Creek) ENGINEER: Spiars Engineering ORIGINAT ON DATE: 7/19/02 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee 7/19/02 t Water Impact Fee $1,400.00 ~ 7/19/02 Wastewater Impact Fee $700.00 Street Sign Street Light 9/19/02 Construction Inspection $1,391.00 $1,391.00 pc 9/23/02 7/19/02 Roadway Impact-Zone $5,937.12 $5,937.12 pc 8/8/02 Street Cut Permit Overtime Inspection 7/19/02 Water Tap Inspection $100.00 $100.00 7/19/02 Wastewater Tap Inspection $50.00 $50.00 7/19/02 Water Meter (Domestic) $62.25 $62.25 7/19/02 Water Meter (Fire/Irrig) $62.25 $62.25 7/19/02 Meter Deposit (Domestic) $30.00 $30.00 7/19/02 Meter Deposit (Fire/Irrig) $30.00 $30.00 7/19/02 Utility Final Inspection $50.00 $50.00 Subtotal to Eng. $7,328.12 $7,328.12 $0.00 Total Fees Fees Paid Amount Owed TOTALS $9,812.62 $7,712.62 $2,100.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.